1 / 27

Coal traffic at Indian Ports Future Projections Where do we need to Invest for Infrastructure?

Coal traffic at Indian Ports Future Projections Where do we need to Invest for Infrastructure?. Traffic at Major ports, the past and the furture – Kolkata port. Paradip Port. Vishakhapatnam Port. Ennore Port. Chennai port. V.O. Chidambaranar Port. Cochin Port. New Mangalore Port.

galeno
Télécharger la présentation

Coal traffic at Indian Ports Future Projections Where do we need to Invest for Infrastructure?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Coal traffic at Indian Ports Future ProjectionsWhere do we need to Invest for Infrastructure?

  2. Traffic at Major ports, the past and the furture – Kolkata port in million tonnes

  3. Paradip Port

  4. Vishakhapatnam Port

  5. Ennore Port

  6. Chennai port

  7. V.O. Chidambaranar Port

  8. Cochin Port

  9. New Mangalore Port

  10. Mormugoa Port

  11. Mumbai Port

  12. Kandla Port

  13. All Major Ports

  14. Non Major Ports- past traffic

  15. Non Major Ports – Future Traffic Gujarat State

  16. Maharashtra State

  17. Goa State

  18. Andhra Pradesh

  19. Tamil Nadu

  20. Kerala

  21. Orissa

  22. Total Non Major Ports Projected Traffic for Coal

  23. Infrastructure needs for meeting the furture Growth • Number of Berths • New Non Major Ports • Increase in efficiency of Coal Handling • Warehousing space for coal • Minimize the Turnaround time of the Ship • Increase the Draft • Rail connectivity with Wagons availability • Road connectivity

  24. Where we need to invest for Coal

  25. Future Plans

  26. Questions ?

  27. Thank You

More Related