Number plate recognition for granting access to uwc
110 likes | 322 Vues
Compiled and Presented by KJ Tsiri Supervisor : Mr. Ismail. Number plate recognition for granting access to uwc. To build a system that will use number plate to identify vehicle. Aim of my project. This is a process of identifying a vehicle using a number plate.
Number plate recognition for granting access to uwc
E N D
Presentation Transcript
Compiled and Presented by KJ Tsiri Supervisor : Mr. Ismail Number plate recognition for granting access to uwc
To build a system that will use number plate to identify vehicle. Aim of my project
This is a process of identifying a vehicle using a number plate. • To recognize the number plate • Capture image • Find the number plate • Plate extraction • Segmentation • Feature extraction • recognition What is number plate recognition
It makes it easier to recognize a vehicle. Effective. It is Cost efficient Why number plate recognition
Able to capture image(retrieve number plate). • Able to recognize. • Compare with database. User requirements
Sensor • Used to detect vehicles and activate the digital camera. • Digital Camera • Used to capture images to be used in the system. • C / Java programming • A program to process image and grayscale them. • Database • Used to store information used for comparison to grant or deny access. Requirements Analysis
Project plan 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Week ACTIVITY1 READ UP TO FIND A PROJECT ACTIVITY2 FAMILIARISE WITH THE PROJECT OF INTEREST ACTIVITY3 REASERCH ON USER REQUIREMENTS ACTIVITY4 RESEARCH ON SYSTEM REQUIREMENTS ACTIVITY5 Determine Costs ACTIVITY6 PRODUCE DRAFT OF USER REQUIREMENTS AND ANALYSES DOCUMENTS ACTIVITY7 PROJECT DESIGN AND DEVELOPMENT (PROTOTYPE) ACTIVITY8 PRODUCE FINAL DRAFT PROJECT IMPLEMENTATION ANALYSES ACTIVITY9 ACTIVITY10 FEATURE EXTRACTION ACTIVITY11 FEATURE RECOGNITION ACTIVITY12 CODING ACTIVITY13 RECOGNITION METHOD ACTIVITY14 TEST SUFFICEINCY OF THE METHOD ACTIVITY15 IMPROVE METHODOLOGY ACTIVITY16 TESTING PRESENTATION ACTIVITY17 CODING AND TESTING ACTIVITY18 CHECKING IF RECOGNITION IS ACCURATE ACTIVITY19 PROJECT TESTING ACTIVITY20
Using number plate recognition is not time consuming. This system is reliable to use. Can help in traffic control, seizing car thieves and managing parking lots automatically. conclusion
[1] VahidAbolghasemi, AlirezaAhmadyfard, “An edge-based color-aided method for license plate detection”, Elsevier, Image and Vision Computing , 27 (2009) 1134–1142. [2] Nicole Ketelaars Italy. (2001). “Automated License Plate Recognition”. AIMe Magazine 2002/1, pp. 9-12 [3] Pei Li “Number plate Recognition ” [4] J. Matas and K. Zimmermann. Unconstrained licence plate and text localization and recognition. In IEEE Proceeding on Intelligent T ransportation Systems, pp. 225 – 230, 2005. [5] Christos Nikolaos E. Anagnostopoulos, Ioannis E. Anagnostopoulos, VassiliLoumos and EleftheriosKayafas, “A License Plate-Recognition Algorithm for Intelligent Transportation System [6] P. Wu, H.-H. Chen, R.-J. Wu, and D.-F. Shen. License plate extraction in low resolution video. In 18th International Conference on Pattern Recognition, 2006. REFERENCES