1 / 12

RCT Shift Report 29 April, 2009

RCT Shift Report 29 April, 2009. K. Grogg Next shifter: Marc Weinberg. 18-crate pattern test problems. No new pattern tests run Attempted on Friday after global run ended GCT source cards were not accessible Contacted GCT on-call, needed reset Weren’t available before MWGR started

Télécharger la présentation

RCT Shift Report 29 April, 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RCT Shift Report29 April, 2009 K. Grogg Next shifter: Marc Weinberg RCT shift report

  2. 18-crate pattern test problems • No new pattern tests run • Attempted on Friday after global run ended • GCT source cards were not accessible • Contacted GCT on-call, needed reset • Weren’t available before MWGR started • Known problems • EM: Crates 0, 1, 2, 3, 5, 7, 9, 16, 17 -- card 6, region 0/1 sharing problem • EM: Crate 15, card 1, 3, 2, 4, 5, 6, has noniso 4 bit stuck low (came, went, came) (GCT) • Sums: Crate 15, card 1, region 0/1 -- 2 bit stuck low (GCT) • EM: Crate 4 -- 2 bit stuck low for all isolated electrons (GCT) RCT shift report

  3. DCS software status summary • Component upgraded to 4.0.1 on Friday • Small bug fixes • Caused brief offline periods and a couple alarms until checksums were updated (10:15-10:45) • Used RMC10 to test that the script behaves properly (11:50-12:20) • Offline periods during this time • Further offline periods for RMC1 and RMC3 occurred when reading their outage logs • These two RMCs had entries because of conflicts with COM port during installation • Causes RMC to go offline for < 1 second • Still needs investigation, possibly new script to test • Spare RMCs will be upgraded this week RCT shift report

  4. DCS Crate Summary • Crates have been stable all week • Offline periods during component installation and testing • Friday 10:15-10:45 and 11:50-12:20 • Crates turned off Monday from 8:55-9:15 while Pam swapped JSCs • vme5V, vme+12V LOW, vme-12V HIGH (FSM in ERROR) for  • Rack 3, Crates A&B • Rack 5, Crates A&B • Rack 9, Crate A • Rack 1, Crate B • Rack 4, Crate A  • Rack 7, Crate B • No unintentional problems, alerts, changes, etc. to the crates RCT shift report

  5. Shift phone • No shift phone calls this week RCT shift report

  6. Data quality monitoring • MWGR started last Wednesday morning • Following plots are for run 82499 • EEG_EHSUMS_TAU3_DECO_25_CRAFT1 • Algo bits 15, 17, 45 • Runs 82342 – 82387 with EEG_EHSUMS key have problem since ECAL timing was off (see Elog 55872) • All non-iso electrons are “red” • No useful information for electrons • Regions are ok • Runs 82499 - 825248 are good • All have similar results to run 82499 RCT shift report

  7. Nonisolated electron efficiencies =100% > 95% > 90% > 85% < 85% • Excellent agreement between data and emulator RCT shift report

  8. Nonisolated electron in/over efficiencies ~ 0% < 5% < 10% < 15% > 15% • Excellent agreement RCT shift report

  9. Region efficiencies =100% > 95% > 90% > 85% < 85% Zipper effect • Agreement ok, not perfect – see next slide for occupancies • Eta 13-15, Phi 12 = Crate 14, cards 2 & 4 • Broken GCT fiber? • Eta 11-12, Phi 9 = Crate 15, card 1 • Appears in pattern tests, the 2 bit is stuck low RCT shift report

  10. Region Occupancies • Occupancies (numbers) are slightly different • Most at the > 99% level • Needs more investigation RCT shift report

  11. Region in/over efficiencies ~0% < 5% < 10% < 15% > 15% Zipper effect • Agreement ok, not perfect • Eta 13-15, Phi 12 = Crate 14, cards 2 & 4 • Broken GCT fiber? • Eta 11-12, Phi 9 = Crate 15, card 1 • Appears in pattern tests, with 2 bit stuck low RCT shift report

  12. HF + tau bit efficiencies =100% ~ 0% > 95% < 5% > 90% < 10% > 85% < 15% < 85% > 15% • Excellent agreement • Except for Eta 13, Phi 12 = Crate 14, Card 2, Region 0 • GCT fiber? • Eta 17, Phi 5 = Crate 17, Card 6 • Over-eff…. RCT shift report

More Related