Residual Waste Treatment in Norfolk - Land Full?

Residual Waste Treatment in Norfolk - Land Full?. Gerry Mole - Head of Environment and Waste Joel Hull - Project Manager 10 January 2006. The Challenge to Norfolk. Municipal Solid Waste and Household Waste Residual MSW - currently sent to landfill Annual increase in MSW

Télécharger la présentation

Residual Waste Treatment in Norfolk - Land Full?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Residual Waste Treatment in Norfolk - Land Full? Gerry Mole - Head of Environment and Waste Joel Hull - Project Manager 10 January 2006

  2. The Challenge to Norfolk • Municipal Solid Waste and Household Waste • Residual MSW - currently sent to landfill • Annual increase in MSW • EC Landfill Directive - diverting BMW from landfill • Biodegradable Municipal Waste - kitchen waste, green wastes, paper, card, cork, textiles

  3. Where We Are Now In 2004/05 • South Norfolk recycled and composted 23.86% • Norfolk recycled and composted 30.75%

  4. Landfill Directive Targets • EC Landfill Directive landfill allowance for biodegradable municipal waste (BMW): 75% of 1995 quantities - 2010 50% of 1995 quantities - 2013 35% of 1995 quantities - 2020 • Requirement for Residual MSW treatment solutions

  5. Landfill Allowances

  6. Focus on 2010 Target Year • Assuming 3.4% growth, 36% recycling • BMW sent to Landfill 210,000t • BMW to Landfill Allowance 167,000t • Over Allowance 2009/10 43,000t

  7. Implications for Waste in 2010 • Costs in 2005/06: Total £10.1M • Estimatedcosts in 2009/10: Fines on WDA £150/tonne £6.5M Plus landfill costs £42/tonne £13.1M Plus landfill tax £30/tonne £9.3M Total £28.9M

  8. The Norfolk Response • Phased contract approach for residual waste treatment • Phase 1 90,000 -150,000 tpa to meet 2010 target • Phase 2 up to approx 400,000 tpa to meet 2013/2020 targets • Not site or technology specific

  9. Treatment Contracts Must Be: • Affordable to the people of Norfolk • Deliverable with regards to technology and planning • Flexible and adaptable over time • Justifiable in terms of environmental performance - the BPEO • Compatible with recycling targets

  10. Phase 1 - ‘Contract A’ • Contract A for 90,000 -150,000 tpa • Aim - 2010 Landfill Directive target • Public Private Partnership • 10%+ recycling of residual waste • 67%+ recovery of residual waste • Award contract 2006 for 25 years • Plant operational 2009/10

  11. Phase 2 • For up to approx 400,000tpa • Aim - 2013/2020 targets • Private Finance Initiative contract? • 30%+ recycling of residual waste? • 67%+ recovery of residual waste? • Award contract 2007/08 for 25 years? • Plant operational 2010+?

  12. Residual Waste Treatment Technologies • Mechanical Biological Treatment • Energy from Waste • Anaerobic Digestion • Pyrolysis / Gasification / Plasma Arc / Vitrification (ATT) • Mechanical Heat Treatment • ‘New’ technologies?

  13. Examples of MSW Treatment • Demonstration plants - Defra • MBT and Anaerobic Digestion - Leicester • EfW - Hampshire, Lincolnshire, Kent • Gasification/Pyrolysis - Bristol • Europe - extensive examples

  14. Where to find more information • Waste Technology Data Centre run by the Environment Agency: www.environment-agency.gov.uk/wtd • What types of waste they accept and recycle, what effect they have on the local community, case studies • www.defra.gov.uk/environment/waste/wip/newtech/advice.htm

  15. Mechanical Biological Treatment (MBT) • Generic term for several processes • Separates recyclates (metals + glass) • Generates soil conditioner (green waste, kitchen waste, card) • Generates refuse derived fuel - RDF (paper, plastics, card, textiles)

  16. MBT and Anaerobic Digestion • Biodegradable fraction from MBT can be treated further by Anaerobic Digestion • Generates soil improver • Produces gas for energy • Stabilized output can be landfilled

  17. Mechanical Biological Treatment (MBT) • RDF sent to another facility eg : Energy from Waste (EfW) Advanced Thermal Treatment (ATT) Used in co-combustion eg cement kilns • RDF capacity? • Suitability of soil improver? • Rejects and market failures to landfill

  18. Leicester (MBT+AD)

  19. Dresden (MBT)

  20. Soil Conditioner (MBT)

  21. Refuse Derived Fuel (MBT)

  22. Sustainable Resource Management Proposal

  23. Sustainable Resource Management Proposal

  24. Sustainable Resource Management Proposal • MBT and AD facility at Longwater • 150,000tpa • Norwich City, South Norfolk, parts of Broadland and Great Yarmouth • One transfer station

  25. Energy from Waste (EfW) • Combustion of waste - small to large scale • Generates electricity and / or heat • Moving grate - common for MSW • Fluidised bed (forced air) - sewage sludge • Oscillating kilns - MSW

  26. Energy from Waste (EfW) • Residues - bottom ash, flue gas residue • Bottom ash - can be used in aggregate, metals can be recovered • Can use RDF • Guaranteed high diversion of BMW • Waste Incineration Directive? • Compatible with recycling?

  27. Isle of Man (EfW)

  28. Vienna (EfW)

  29. Energy from Waste (EfW) Marchwood, Hampshire 165ktpa Dundee 120ktpa Chineham, Hampshire 90ktpa Dudley 90ktpa Havant, Hampshire 165ktpa Wolverhampton 110ktpa Grimsby, Lincolnshire 56ktpa Lerwick 26ktpa Allington, Kent 500ktpa Cleveland 245ktpa Isle of Man 60ktpa Stoke 200ktpa Sheffield 150ktpa Tyseley, Birmingham 350ktpa Neath, Swansea 135ktpa South East London 420ktpa Kirklees 136ktpa Modern UK plants with capacity in tonnes per annum

  30. Waste Recycling Group Proposal

  31. Waste Recycling Group Proposal

  32. Waste Recycling Group Proposal • Recycling and Energy Centre at Longwater • MRF and Energy from Waste plant • 150,000tpa (135,000 EfW plant) • Norwich, Broadland and parts of South Norfolk and Breckland • Three transfer stations

  33. Planning and Permitting Applications • The Planning Authority considers whether a proposed development is appropriate and allows others to help form this view • The Environment Agency considers whether a proposed technology / approach is appropriate and allows others to help form this view

  34. Phase 1 - Progress • Three bids received in May 2005 • Bids clarified and evaluated • Waste Recycling Group selected as Preferred Bidder • Sustainable Resource Management selected as Reserve Bidder

  35. Phase 1 - The Next Steps • WRG consults on scope of issues • WRG holds open days 7/8 Feb • NCC award contract spring 06 • Contractor submits applications for planning and permit summer 06 • Stakeholders consulted

  36. Thank you for listening Joel Hull Project Manager Gerry Mole Head of Environment and Waste