gareth
Uploaded by
21 SLIDES
529 VUES
230LIKES

Building Lean Systems Mixed Model Scheduling

DESCRIPTION

Building Lean Systems Mixed Model Scheduling. Mixed-Model Scheduling and Small Batch Production. In a perfect world, when the customer pulls a product from the final station, a signal is generated on each upstream resource to produce exactly what is pulled.

1 / 21

Télécharger la présentation

Building Lean Systems Mixed Model Scheduling

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Building Lean SystemsMixed Model Scheduling

  2. Mixed-Model Scheduling and Small Batch Production • In a perfect world, when the customer pulls a product from the final station, a signal is generated on each upstream resource to produce exactly what is pulled. • In the real world, changeover time, material availability, or operator availability motivates large batch production. • Large-lot production exacerbates Bowlwhip effect. • WIP between stations goes up, flow time goes up

  3. Mixed-Model Scheduling and Small Batch Production • Produce every product as quickly as possible, at the same rate at which customer demands are made. •  In a lean system, products flow smoothly through the enterprise with no delays • Mixed-model scheduling (heijunka) • Evenly distributing the production of different products over a period of time • Changeover or setup times must be small • Small batching in the presence of setup times

  4. MMS Example • Demand per hour A(3), B(2), and C(1). • 10 min/part assembly time. 10 hrs/day, 5d/w. •  Batch size is one week of demand; A(150), B(100), C(50). • Instead of receiving products every hour, the customer will receive them once a week. The average inventory is 75 As, 50 Bs, and 25 Cs. • If production per hour was A(3), B(2), C(1), the finished goods inventory would be negligible because production would exactly match hourly demand.

  5. MMS Example • AAABBC is a good hourly schedule, it could be more finely sequenced as follows: ABACAB. • Production in large batches • uneven workload • uneven demand for upstream processes, pull impossible • production is not synchronized with demand. • Mixed-model production: • smooth work-load, • smooth demand for upstream processes • Allows production to match customer demand.

  6. Mixed Model Sequence for Volpens Smallest possible sequence length = 1/0.09 = 11.11 Choose a 11 unit sequence; adjust every two cycles. Note: A mixed model sequence is used to intentionally vary work content and component requirements.

  7. Mixed Model Sequence For Volpens Seq. # Model Desc. Seq. # Model Desc. 1 Blue Pen 18 Blue Shell 2 Red Pen 19 Red Pen Yellow Pen 3 Blue Pen 20 4 21 Blue Pen Red Shell 5 Blue Pen 22 Yellow Shell Yellow Pen Blue Pen 6 23 7 Blue Shell 24 Red Pen Red Pen 8 25 Blue Pen 9 Yellow Pen Red Shell 26 10 Blue Pen 27 Blue Pen Yellow Shell Yellow Pen 11 28 12 Blue Pen 29 Blue Shell 13 30 Red Pen Red Pen Yellow Pen 14 Blue Pen 31 Red Shell 15 32 Blue Pen 16 Blue Pen Yellow Shell 33 17 34 Red Shell Red Pen

  8. One Piece Flow • Reduce lead time by reducing WIP • Move products between workstations • Average lead time = WIP/Throughput • What is the average lead time for the system above, if throughput is 100/week? • 2.4 weeks

  9. One Piece Flow Process 1 Process 2 Process 3 Process 4 What is the average lead time for this system? 1 unit 1 unit 1 unit 1 unit • One piece could mean a pallet, a box etc. • Is not practical in every situation • One-piece flow may require relocation of the people/equipment. • A process layout (grouping operations by function) must be replaced by a product layout (arranging operations in the order of flow.)

  10. Batch Process For Volpens, Ltd. Cap Assy Pen Assy WIP WIP Label Press Peel& Stick Production Scheduler Test, Pack & Ship Inspect Material Flow Raw Materials Finished Goods Information Flow

  11. Takt Time for Volpens, Ltd. Monthly Demand = No. of days per month = 16 Daily Demand = Avail. Time/Day = Takt Time = 68

  12. Manpower requirements for Volpens Ltd. • Pessimistic times for the current activities • Cap Assembly: 25 seconds • Pen Assembly: 17 seconds for pens, 5 seconds for shells • Label Making: 28 seconds • Peel & Stick: 16 seconds • Test,Pack,Ship: 15 seconds

  13. Manpower requirements for Volpens Ltd. • Note that activities 3, 4, 5 are not performed for shells. Also, activity 2 is minimal for shells. The only activity done, for all items, is cap assembly. • The time for activity 3 includes an allowance for changing coils; excluding this allowance, a pessimistic time will be 23 seconds. Use this number for your calculations.

  14. Minimum Manpower Required for Volpens, Ltd. Monthly Demand for Pens = 48 Monthly Demand for Shells = 20 Total Monthly Demand = 68 Percentage Demand for Pens = Percentage Demand for Shells =

  15. Minimum Manpower Required for Volpens, Ltd. ActivityPens ( %) Shells ( %) Ave.Time/Unit Cap Assembly Pen Assembly Label Making Peel & Stick Test,Pack,Ship _____________ Total Labor Content per Unit: Takt Time per Unit: Minimum Manpower Required =

  16. Mixed Model Sequence for Volpens Smallest possible sequence length = 1/0.09 = 11.11 Choose a 11 unit sequence; adjust every two cycles. Note: A mixed model sequence is used to intentionally vary work content and component requirements.

  17. Seq. # Model Desc. Seq. # Model Desc. 1 Blue Pen 18 Blue Shell 2 Red Pen 19 Red Pen Yellow Pen 3 Blue Pen 20 4 21 Blue Pen Red Shell 5 Blue Pen 22 Yellow Shell Yellow Pen Blue Pen 6 23 7 Blue Shell 24 Red Pen Red Pen 8 25 Blue Pen 9 Yellow Pen Red Shell 26 10 Blue Pen 27 Blue Pen Yellow Shell Yellow Pen 11 28 12 Blue Pen 29 Blue Shell 13 30 Red Pen Red Pen Yellow Pen 14 Blue Pen 31 Red Shell 15 32 Blue Pen 16 Blue Pen Yellow Shell 33 17 34 Red Shell Red Pen Mixed Model Sequence For Volpens

  18. Mixed Model Assembly Schedule for Volpens Family: Shells Week 3 Week 4 Week 5 Week 6 Blue Shell SB1 1 2 1 2 Red Shell SR2 2 2 2 2 Yellow Shell SY3 1 2 1 2 Totals 4 6 4 6 Family: Pens Week 3 Week 4 Week 5 Week 6 Blue Pen & Case PCB1 7 5 7 5 Red Pen & Case PCR2 4 3 4 3 Yellow Pen&Case PCY3 2 3 2 3 Totals 13 11 13 11

  19. Mixed Model Scheduling: Lean Loading For Caps Units Workload on Operators

  20. Mixed Model Scheduling: Purchase Orders For Caps Units Units Units