Title I Design Status. RSY – CLOC Research Yard Beam Transport Hall Undulator Hall Electron Beam Dump Front End Enclosure Near Experimental Hall X-Ray Transport & Diagnostics Tunnel Far Experimental Hall Central Lab Office Complex. Research Yard & Beam Transport Hall.
E N D
Title I Design Status • RSY – CLOC • Research Yard • Beam Transport Hall • Undulator Hall • Electron Beam Dump • Front End Enclosure • Near Experimental Hall • X-Ray Transport & Diagnostics Tunnel • Far Experimental Hall • Central Lab Office Complex
Research Yard & Beam Transport Hall • Demo building 102A • BTH entrance • BTH tunnel -164 meters • BTH head-house, 63 meters • Removable ports • Ability to accommodate future ± 2° and 4° beam-lines
Beam Transport Hall-Head House • New Head House-63 Meters • Ceiling Height Reduced to 10’
Beam Transport Hall-East End • Tunnel entrance • Building being relocated on top the berm • Removable cap for future equipment installation
Undulator Hall – West End • Undulator Hall- 175 meters • Critical temperature control • .2 Degree C • Critical slab stability • Large alcoves being deleted • Critical HVAC equipment above ground • ~60’ cover Plan View Cross Section
Undulator Hall – East End Plan View • Mechanical & Electrical Rooms • ~20’ Cover Cross Section
Electron Beam Dump&Front End Encl. • Electron Beam Dump • Front End Enclosure • Equipment access from NEH • Construction will be cut and cover • ~15’- 20’ cover Plan View • 3’ and 4’ steel shielding Cross Section
Near Experimental Hall-Subbasement • Shops • Preparation and Control Area • Shielding • Experimental Hutches Plan View
Near Experimental Hall-Basement • Parking space (14) • Mechanical Equipment Area • Service Dock • Wet Lab • Laser Bay Plan View
X-Ray Transport & Diagnostics Tunnel • X-Ray Transport Tunnel • 250 meters Plan View • Elimination of HVAC system • Entrance and Exiting Improvements Cross Section
Far Experimental Hall • Shop Complex • Preparation and Control Area • Experimental hutches • Laser bay • Layout is currently under review for possible changes to increase hutch sizes Plan View
FEH 2nd Floor - Office Area • Office and Conference area • General Purpose area • Elevator Plan View Cross Section
Typical Sections Cross Section Cross Section Cross Section Cross Section
Central Lab Office Complex 1st Flr – 18,143 sf 2nd Flr – 28,544 sf 3rd Flr – 26,172 sf Total - 72,859 sf • Large Conference Center • Office Facilities for 282 Personal • 6 Laser Labs • Six pods consisting of Experimental/ Research Clusters • Other groups include laser, ic and vacuum techs; mech/elec eng; computer network, etc First Floor Plan Second Floor Plan Third Floor Plan
Central Lab Office Complex • West Complex 3 Story • East Complex 2 Story Building Cross Section Looking North • Conference Center • NEH 1st and 2nd flrs Building Cross Section Looking East