1 / 9

Simulators

Simulators. Eric Poiseau Inria , Rennes. Purpose. Simulate the missing actor in a test To be used as pre-connectathon tool Interfaces with Gazelle either to be driven by Gazelle or to report to Gazelle. Where are we at ? . Overview Laboratory LBL, ORT

gelsey
Télécharger la présentation

Simulators

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Simulators Eric Poiseau Inria, Rennes

  2. Purpose • Simulate the missingactor in a test • To beused as pre-connectathontool • Interfaces with Gazelle either • to bedriven by Gazelle or • to report to Gazelle

  3. Where are weat ? • Overview • Laboratory • LBL, ORT • IT-Infrasctructure • PDQ, PDQ V3, XCPD, XUA, XDR, XCA, SVS • Pharmacy • Startingwith HMW • Pathology • Startingwith OF

  4. Common Component • Wrote a libraryto hooksimulatorsto Test Management • Wrote a library for common HL7 utilities • GUI components • Call to validation services • Configuring and starting an HL7 listener

  5. Laboratory • LBL • A simulator thatsimulatebothactors for the profile • Messages are validated by EVS • For LAB-62 PID segment populatedusing DDS • LTW • Only the OrderResulttrackerissimulatedtoday • Messages are validated by EVS • We are working on finishing the display of the received messages.

  6. Pharmacy • HMW • Working on implementing the HMW model in Java • HL7 message profiles for the profile are written and available in the HL7 message profile registry. • Expected plan for first version : • End of summer 2011 • DIS, PRE, PADV • Schematrondevunderprocess • Development of CDA generator for PRE, DIS required for the simulators of the actors in theseprofiles • Expected plan for first version : • End of summer 2011

  7. Pathology • HL7 Message profiles are written and canbeusedthrough the EVS • Work on the OF (MWL) is in progress. On hold for the moment, waiting for the SVS part to becomplete in order to ramdomlypopulate the dicomfieldswith values

  8. Resources • In 2009 : 1 pm • In 2010 : 13 pm • In 2011 : estimation 20 pm

  9. Links and URL • Support : • http://gazelle.ihe.net/jira and search project corresponding to simulator in question • Documentation (WIP) • http://gazelle.ihe.net/content/simu-simulators • Tools : • http://gazelle.ihe.net/LBLSimulator • http://gazelle.ihe.net/XCAInitGatewaySimulator

More Related