An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MN Transmission for Renewable Energy Standard NM SPG Update 4/3/07

  2. Issue • In 2007, the MN Legislature passed, and the Governor signed legislation regarding “Transmission for Renewable Energy Standard”. 216B.1691

  3. Key Components of RES Transmission Legislation • Study and develop plans for transmission network enhancement to support RES standards and milestones. • Incorporate and build upon past studies (Wind Integration). • Collaborate with MISO. • Convene and regularly consult with stakeholders (transmission planners, renewable generation technology experts) to review study methods, assumptions, results and ongoing efforts. • Submit a report to PUC on status of efforts by 11/01/07.

  4. Report Requirements • Description of analysis undertaken and results, including critical issues that need to be addressed in order to meet RES and milestones. • Comprehensive conceptual plan (Roadmap) to going planning efforts to meet RES and milestones. • Specific transmission line proposals necessary to meet RES and milestones. • Description of how the RES transmission projects are incorporated into the Biennial Plan.

  5. Report Requirements Cont’d • Five-year action plan that identifies specific actions that are • Necessary to implement the specific proposals • Refine and further develop transmission plans • Includes initiating CON or other regulatory proceedings

  6. Utilities 2012 12% 2016 17% 2020 20% 2025 25% Xcel 2010 15% 2012 18% 2016 25% 2020 30% Milestones