1 / 13

Pollution Prevention Case Study

Pollution Prevention Case Study. LORD CORPORATION Mechanical Products Division Cambridge Springs Facility. Pollution Prevention Case Study. Location: CS, PA on banks of French Creek Employment: 190 Products: Rubber-to-metal Vibration Isolators for example – Motor Mounts Markets:

gil
Télécharger la présentation

Pollution Prevention Case Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pollution Prevention Case Study LORD CORPORATION Mechanical Products Division Cambridge Springs Facility

  2. Pollution Prevention Case Study • Location: CS, PA on banks of French Creek • Employment: 190 • Products: Rubber-to-metal Vibration Isolators • for example – Motor Mounts • Markets: • On & Off highway vehicles • HD/GM/JD/Cat/Case • Subway track pads • Philadelphia/Pittsburgh/Detroit/Chicago/Buffalo/NYC • Water Craft • Mercury Marine

  3. Pollution Prevention Case Study (metal preparation) • Steel Grit Blasting • Aluminum Oxide Grit Blasting • Alkaline Cleaning/Degreasing • Zinc Phosphatizing Of Steel • Alodizing Of Aluminum

  4. Pollution Prevention Case Study (metal preparation) • Recovery systems on grit blasters • Switched to alkaline cleaning • Ultrafiltration of alkaline cleaners • Micro-Addition of chemicals • Flow restrictors on rinse tanks • Scrubber water to rinse tanks • Recycle rinse water

  5. Pollution Prevention Case Study (adhesive application) • Spray Transfer (Manual & Auto) • Dip Tanks (Conveyorized) • Fixture Cleaning

  6. Pollution Prevention Case Study (adhesive application) • HVLP spray guns • Intermittent conveyor & spray • Monitor coating thickness • Inventory control • Burn-off oven • Soy based fixture cleaner • Dry booths

  7. Pollution Prevention Case Study (rubber bonding) • Transfer Presses • Injection Presses

  8. Pollution Prevention Case Study (rubber bonding) • Redesign molds • Recycle rubber waste • Ultrafiltration of hydraulic fluid • Biological treatment of water/hyd. fluid • Cryogenic salvage

  9. Pollution Prevention Case Study (general plant activities) • Administrative • Shipping / Receiving • Chilled Process Water

  10. Pollution Prevention Case Study (general plant activities) • Recycle office paper • Recycle cardboard • Recycle pallets • TDS controllers on chilled water system

  11. PCE Degreasing MC Fixture Cleaning Mineral Spirits Parts Washer Wet Spray Booths PCE Salvage Alkaline Degreasing Soy/Oven Fix. Clean. Biological or Citric Parts Washer Dry Spray Booths Cryogenic Salvage Pollution Prevention Case Study Replacements

  12. Pollution Prevention Case StudyObstacles & Benefits • Company Culture • Customers • Fixed Part Approvals • Break – Boeing approved alkaline degreasing • Cost • Non-HAP solvents • Savings: >$100,000/yr.

  13. Pollution Prevention Case StudyLegacy of PCE Degreasing • Cambridge Springs • Phytoremediation under Act 2 • Other Lord facilities • Pump & Treat • Air Sparging • ERD (Molasses)

More Related