1 / 12

Failure Impact vs Project Importance Safety First SI-Wide

Project Prioritization . Failure Impact vs Project Importance Safety First SI-Wide. APPROPRIATIONS & PROGRAM ($M). FEDERAL APPROPRIATIONS PRIOR YEAR FY01 $ 67.0 FY02 $ 97.9 FY03 $ 81.9 FY04 $107.6 FY05 $126.1 FY06 $ 98.5 FY07 $ 98.6

gillian
Télécharger la présentation

Failure Impact vs Project Importance Safety First SI-Wide

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Prioritization • Failure Impact vs • Project • Importance • Safety First • SI-Wide

  2. APPROPRIATIONS & PROGRAM ($M) FEDERAL APPROPRIATIONS PRIOR YEAR FY01 $ 67.0 FY02 $ 97.9 FY03 $ 81.9 FY04 $107.6 FY05 $126.1 FY06 $ 98.5 FY07 $ 98.6 CURRENT & FUTURE PROGRAM STATUS FY08 Construction $105.7 (Received) FY09 Design $122.4 (Requested) FY10 Schematic $150.0 (OMB) FY11 Pre-Planning $150.0 FY12 Five Year Plan $150.0 Master Planning

  3. Current Project Highlights Public Space Renewal American History $63 million Turner Asia Trail II (Elephant Trails) $37 million William V. Walsh NASM Electrical $6.4 million HSU POD 3 Renovation $10 million Clark

  4. FY 2009 Project Highlights • Designs move into the 21st Century with Building Information Models • Cooper Hewitt (NYC) renovation: • American History Museum: PSRP III • Natural History Museum: HVAC revitalization • National Zoo: fire protection, structural repairs of General Services Bldg • Suitland: demolish old storage facilities • STRI (Panama): rehab Gamboa schoolhouse and replace Bocas Visitor Center • SERC (MD): complete design of Mathias Laboratory Expansion • National Museum of African American History and Culture: • design and selection of CM at Risk

  5. National Museum of African American History and Culture Site

  6. CONSTRUCTION DIVISION Construction Management Contract Support North Mall Resident Engineer South Mall Resident Engineer Off Mall Resident Engineer ZOO Resident Engineer New York Resident Engineer CM Support Contractors Bovis PB America Jacobs Mark Anderson McKissick & McKissick

  7. Construction Contract Cost Growth High Interest Projects Industry Cost Growth Standard for Renovation Projects = 15% Industry Cost Growth Standard for New Construction Projects = 5%

  8. Construction Contract Time Growth High Interest Projects

  9. PROJECT EXECUTION Guiding Principles • Facility Project Management Handbook • Select CII Best Practices • Current Working Estimates (CWE) • Smithsonian Directive 410 • User/Client early and continuous involvement • Project Management • Unambiguous project leader, Integrated Project Team • Guides project alignment (PDRI) • Controls Scope, Budget, and Schedule • Construction Management • Monitors Safety, Quality, Security & Accessibility • Manages Change Orders and RFI’s • Office Engineer

  10. Anacostia Museum National Postal Museum

  11. Suitland, Maryland Facility

  12. and Front Royal, Virginia National Zoological Park, Washington DC

More Related