gitano
Uploaded by
9 SLIDES
324 VUES
90LIKES

Engineering Design II Project Final Presentation

DESCRIPTION

Engineering Design II Project Final Presentation. Group 6: Charles Norona , Allan Pinero, and Christopher Sizelove. Presentation Outline. Original Concept Final Design and Implementation Final Gantt Chart Status Field Demo (Video) Classroom Demo. Original Concept.

1 / 9

Télécharger la présentation

Engineering Design II Project Final Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Engineering Design II Project Final Presentation Group 6: Charles Norona, Allan Pinero, and Christopher Sizelove

  2. Presentation Outline • Original Concept • Final Design and Implementation • Final Gantt Chart Status • Field Demo (Video) • Classroom Demo

  3. Original Concept Indoor Firefighter System • Mobile Ad-Hoc Network • Plethora of information • Biometrics • Motion Status • Fully interactive basestation.

  4. Final Design and Implementation • Base station application • Acts as Bluetooth server • Choice of blueprint or other image as a background • Interprets motion of blip and its direction • Blip is “dragable” • Mobile app: RIFL Mobile • Acts as Bluetooth client • Transmission of sensor values • Calibration • Sensor test

  5. Final (Sort of) Design

  6. Final Gantt Chart Status

  7. Field Demo (Video)

  8. Classroom Demo

  9. Questions or Comments

More Related