280 likes | 552 Vues
Of 1 st Year. Santhalakshmi RSM Engineering Solutions Pvt . Ltd .,. S erve the Industry with Quality On Time At Competitive Price.
E N D
Of 1st Year Santhalakshmi RSM Engineering Solutions Pvt. Ltd.,
Serve the Industry with Quality On Time At Competitive Price
SRSMES is a growing Cement Plant and Waste Heat Recovery (WHR) System designer and supplier of machinery in collaboration with reputed machinery suppliers. Have good engineering consultancy capability. Our Managing Director Mr. R.S.Mani, has served for MNCs and played a key role in winning orders and executing several projects. We provide comprehensive range of services and solutions to our client’s technical and project management needs. Santhalakshmi RSM Engineering Solutions Pvt. Ltd.,
Our Capabilities • New Cement Plant Design • Small Projects • Customized Solutions • Modernization, Improvements & Upgrade • Process Plant Audit • Plant Operational Support • Perform, Achieve, Trade (PAT) • Waste Heat Recovery System • Alternate Fuel Solutions • Onsite Training
JK LAKSHMI CEMENT SIROHI LINE-I PH UPGRADATION • Successfully upgraded and increasing the capacity from 3300 to 4500 TPD • Excess air Calciner was replaced by New In-Line Calciner and Tertiary Air Duct. • Three PH cyclones modifications were completed. • Three more PH cyclones engineering completed • and will be executed during next shut down.
GUJARAT SIDHEE CEMENT PYROPROCESS UPGRADATION • Separate Line Calciner Preheater - Successfully modified the Cyclones 3 & 4 in both Kiln and Calciner towers • Capacity increased from 4000 to 4600 TPD • Substantial savings in pressure drop of • 50-135 mmwg per cyclone was achieved • Good savings in Sp. Power consumption.
ULTRATECH CEMENT, RATNAGIRI CEMENT MILL SEPARATOR REPLACEMENT • Designed and Supplied Cement Mill Separator successfully on time • Capacity will increase with this latest design separator • Specific power consumption will reduce considerably
CHETTINAD CEMENT PULIYUR - PYRO UPGRADATION • PH Cyclones 2 & 3 were upgraded. • Substantial savings in pressure drop, 50 mmwg per cyclone and savings in specific power consumption of 0.4 kWh/ton in PH fan were achieved • Calciner up-gradation is being planned to increase the residence time and to fire pet coke
CHETTINAD CEMENT PULIYUR - PYRO UPGRADATION • PH Cyclones 4 & 5 Engineering completed and will be modified during next shut down. • Substantial savings in pressure drop, 50 mmwg per cyclone and savings in specific power consumption of 0.4 kWh/ton in PH fan envisaged • Cooler up-gradation is being planned to reduce • the specific fuel consumption by 3 Kcal/kg cl • and reduce wear
JK LAKSHMI CEMENT SIROHI LINE-I WHRS AQC • Successfully designed ,supplied and commissioned WHRS-AQC Boiler in collobaration with VEESONS • Steam generation up to 8.0 TPH achieved against guaranteed 6.2 TPH • Overall power generation increased
Nagarjuna Cement, simhapuri • Operational Support Contract for one year period to improve the performance of the Plant, Capacity, Fuel, Power consumptionand Raw Mix optimization in the following areas • Line 1 pyro process • Line 2 pyro process • Raw grinding - Vertical Roller Mill • Coal grinding - VRM & Ball Mill • Various cement grinding systems
Cement Plant Design and Supply • Complete Cement Plant Design and Supply. • Overall Exposure and capabilities are high in all sections viz. Pyroprocess, WHRS, Alternative Fuels, Raw, Coal and Cement grindings. • Consultancy services. • High Degree of Technical Expertise in Cement Plant Design & Engineering, Operation, Commissioning and Maintenance.
Plant Upgrade • Expertise in Cement Plant up-gradation with unique skills and possess highly experienced professionals. • Customized and best Solutions are provided in up-gradation instead of standard solutions.
Waste Heat Recovery System • Complete design of WHRS for the cement plant. • WHRS Engineering and Supply with reputed Suppliers. • SRSMES can conduct audit / feasibility study to establish the availability of hot gases from Pre Heater and Cooler and calculate the Possible Power Generation. • Up-gradation of WHR • With expert knowledge on cement plant our WHRS solutions are customised • Alternate Fuels • Design a suitable alternative fuel feeding system. • Calculation of alternative fuel substitution rate.
Plant Audits • Establish the present performance, identify the bottlenecks and scope for improvement. • Suggestion of methods to improve overall process and operation, increase production, improve fuel efficiency, reduce the power consumption, gaseous emissions and the overall plant operating costs. • Cement Plant Process Training • Customized Training modules in Cement process, Chemistry and Process measurements & plant performance evaluation. • Perform Achieve Trade (PAT) • Based on the process audit, recommendations are provided to match the PAT rules in order to improve the efficiency of the plant.
Plant Operational Support • We will enter into a Contract for 1 year duration with the customer and send our expert for 2 days every month to support plant operation and optimize the plant. • Complete process analysis • Specialists will visit and carry out complete analysis of the plant. Prime challenges will be identified. Baseline parameters will be established. • Expert suggestions to eliminate prime challenges • Suggestions to eliminate the prime challenges will be offered. Plant personnel will implement the same and send the feedback. SRSMES will analyse the reports and further improvements will be suggested. • Continuous support for sustaining and enhancing the capacity • In addition from eliminating the challenges identified, capacity enhancement possibility in different sections will be studied and improvements required will be suggested.
Plant Operational Support • Exploring possibilities for efficient fuel and power consumption • Fuel & Power consumption will be calculated and support offered to reduce the same to optimum value. This ultimately reduces the operating cost. • Suggestions for improving raw mix and reduce production cost • Raw material details will be studied and possibilities to improve raw mix design will be explored. • Suggesting and executing essential modifications and up-gradation • Modifications necessary to improve plant performance will be proposed. Engineering and design for the same will be submitted as a separate proposal .
MOU with IKN (Global) on selected WHRS • IKN is a German based cement plant supplier • Engineering and Design by SRSMES • Joint venture on supply of WHRS CORPORATE AND BUSINESS AGREEMENT • Agreement with FIVES-FCB • FIVES-FCB is a 200 years old French supplier of complete cement plant • Fives-FCB has various ranges of grinding mills including Horomill • SRSMES and FIVES will jointly promote grinding technology/Products to Indian customer.
Contact Details Santhalakshmi RSM Engineering Solutions (P) Ltd., # 3308, Block 3, TVH Svasti, EswaranKoil Street, Thoraipakkam, Chennai – 600 097 Tamilnadu, India Web : www.srsmes.com E-mail : info@srsmes.com Tel : 91 44 2985 7765