MODAPS PIP Report. July 7, 2009. 1-877-711-1856 759461. Summary of MODAPS Production 7/7. Forward Processing C5, 5.1 and 4.1: Aqua forward processing is as close to real time as possible; Terra is 5 days behind for Atmospheres and LST

giulio
Télécharger la présentation

MODAPS PIP Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MODAPS PIP Report July 7, 2009 1-877-711-1856 759461

  2. Summary of MODAPS Production 7/7 • Forward Processing C5, 5.1 and 4.1: • Aqua forward processing is as close to real time as possible; Terra is 5 days behind for Atmospheres and LST • The GES-DAAC is investigating missing Terra ephemeris for day 184. • We have completed PGE41 (MCD12Q1), C5 Land Cover Quarterly processing for years 2002-2007 • These will need to be reprocessed . • We have processed PGE87 (), C5 Land Cover CMGs through year 2005; year 2006 will complete later this week. • Collection 5.1 Burned Area Reprocessing • The leading edge for this reprocessing is at day 2003/084.

  3. Summary of PGE Deliveries to SDST (7/7) Collection 5 • Atmospheres: • A new version of PGE69 was delivered and baselined 6/12 to correct the bug found in the last science test. • Delivery of the Terra Deep Blue PGEs is expected July 15. • Land: • A new version of PGE11(LSR) for Mandriva has been delivered. We will wait for review of the L1b destriping code before running a science test. Collection 6 • Level 1: • A C6 Terra and Aqua PGE01 has been baselined. • A Terra and Aqua L1B for collection 6 has been baselined. • We are expecting a new delivery with science code updates in mid-July. • Land: • We have received the collection 6 versions of PGE16 (LST), PGE75 (daily CMG), PGE21 (8-day Surface Reflectance), PGE90 (Aeronet Subsetter) and PGE11(LSR)

  4. Summary of Science Testing (7/7) • Atmospheres: • The latest version of PGE69 had several errors that are under review. This PGE will continue to run in test mode at the leading edge while the errors are being reviewed. • Land Science Testing: • A science test for PGE72 (for land water mask) is running. Nine of 12 16-day periods have completed. This test is expected to complete July 13. • We are generating 1-year test data set of C6 PGE11(LSR) and PGE75(CMG) to be used for collection 6 science testing. • L1 Science Testing: • A second science test for C6 PGE01 was processed through LSR and control points. • Mandriva Science Testing: • PGEs 01, 02, 03, 07, 08, 43 and 44 have passed Mandriva testing. • A chain test from L0 through the land dailies has completed and is under review. The second test is expected after review of the l1b destriper code. • Land PGEs are being tested using inputs generated on the Mandrake system • PGE 33 is being reviewed by the developer • PGEs 3,7,8,11,12,13,14,15,22,43,44,46,75,80 and 84 were tested. • A second science test for PGE16 completed and failed. • Tests for 8- and 16-day PGEs completed; PGEs 21,45,31,58,25,35,29 and 34 passed, PGE72 failed. • Work is continuing on the atmospheres PGEs. • A science test is running for PGE06