An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Review Time (Construction Stormwater Permit) • 1. SWMP

  2. Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS

  3. Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS

  4. Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS

  5. Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections

  6. Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping

  7. Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping • 7. Final Stabilization

  8. Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping • 7. Final Stabilization

  9. Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping • 7. Final Stabilization

  10. Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping • 7. Final Stabilization

  11. Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping • 7. Final Stabilization

  12. Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping • 7. Final Stabilization

  13. Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping • 7. Final Stabilization

  14. Review Time (Construction Stormwater Permit) • 1. SWMP • 2. Implement BMPS • 3. Maintain BMPS • 4. Remove Temporary BMPS • 5. Inspections • 6. Record Keeping • 7. Final Stabilization

  15. Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575

  16. Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575

  17. Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575

  18. Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575

  19. Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575

  20. Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575

  21. Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575

  22. Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575

  23. Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575

  24. Colorado’s Stormwater ProgramPermitting & Compliance Colorado Department of Public Health and Environment Water Quality Control Division www.cdphe.state.co.us/wq/PermitsUnit Kathy Rosow: 303-692-3521 Matt Czahor: 303-692-3575

  25. E. SWMP contents (5 parts) • 1. Site Description • Clear description of the construction activity that addresses ALL the items (8) required by the permit

  26. E. SWMP contents (5 parts) 2. Site Map Legible, complete and up-to-date map that addresses ALL the items (8) required by the permit State ECS training 9/07 26

  27. E. SWMP contents (5 parts) • 3. Stormwater Management Controls Narrative description of all stormwater management controls: before, during, and after construction. Must minimally describe/identify items ALL the items (3) required by the permit • a. SWMP administrator • b. Identification of Potential Pollutant Sources

  28. E. SWMP contents (5 parts) • 3. Stormwater Management Controls (continued) • c. BMPs and associated installation details 1. Structural BMPs 2. Non-Structural BMPs 3. How BMP implementation will be phased 4. Materials Handling and Spill Prevention 5. Dedicated Concrete or Asphalt Batch Plants 6. Vehicle Tracking Control 7. Waste management/disposal, including concrete washout 8. Groundwater and stormwater dewatering

  29. E. SWMP contents (5 parts) • 4. Plan for Final Stabilization • All ground disturbing activities complete; and all disturbed areas built upon, paved, or hard armored, orestablished uniform vegetative cover with a density of at least 70% of predisturbance levels. • More detail than you think: • What type of cover will be used? • Specific seed mixtures and application rates? • Will the soil need to be amended? • Special methods on steep slopes/concentrated flow?

  30. E. SWMP contents (5 parts) • 5. Inspection and Maintenance • Procedures to inspect and maintain BMPs • Inspections • Minimum: every 14 days and within 24 hours after precipitation events or snow melts. • Exception for temporarily idle sites – up to 72 hours following storm event. • Keep an inspection log. • Minimum requirements identified. • BMP maintenance – immediately in most cases