An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EPA Stormwater 5G3 Construction General Permit Delegation to NJDEP/SCD’s Permit application process E-Permit SWPPP vs. SESC Plan SECS Requirements SWPPP requirements Paper Field *

  2. Application Process • Submittal of paper permit to District with SESC plan……. Not Anymore! • Submit SESC Plan to District only • Once SESC Plan approved you get a “Certification Code” letter from the District to…. • Apply on-line for your 5G3 Construction General Permit: • E-Permit • * 1 acre disturbance • * 5 acre disturbance • Must apply ASAP after SESC Plan approval or 30-days prior to construction. *

  3. Application Process (cont’d) Certification Code Letter Chapter 251 ID # Randomly selected “SCD Certification Code Register as a user with DEP online Once registered you need the following information to complete the E-Permit: 1-11. *

  4. Permit Obligations (Paperwork) • Permit developed in response to a lawsuit from environmetal advocacy groups. Permit prominently displayed • Contact name/number clearly visible • Maintain logbook • Weekly/after storm accounts • Annual Certifications *

  5. Permit Obligations (SESC) • Standards shown on the SESC Plan • Same as before • Stamped Plan on-site • Silt fence • Tracking pads • Sediment basin • Rip rap • Seeding *

  6. Permit Obligations (SWPPP) • Concrete washout (s) • Spill Kit on-site • Fuel tanks protected in case of leaks • Trash dumpsters (being used) • Outhouses *