The role of TSOs in the third package

. The role of TSOs in the third package. GIE conference 7 May 2009. Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas. EUROPEAN COMMISSION. Structure of the presentation. Main topics of the 3rd package Timing of implementation ENTSO and its tasks

giulio
Télécharger la présentation

The role of TSOs in the third package

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The role of TSOs in the third package GIE conference 7 May 2009 Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas EUROPEANCOMMISSION

  2. Structure of the presentation • Main topics of the 3rd package • Timing of implementation • ENTSO and its tasks • Agency and its competences • Process to develop codes • 10-year network development plan

  3. 3rd package: main measures • Effective unbundling of networks • EU Regulatory Agency • Cooperation of network operators (ENTSO) • Stronger powers for national regulators • Transparency • Retail market & consumer protection • Third country clause • Level playing field

  4. Third Package : Implementation • Adoption by Council in Summer 2009 • Agency operational in 2011 • ENTSO statutes to be provided to the Agency and the Commission18 months after entry into force of the Regulation • Opinion of the Commission and the Agency • Formal establishment of ENTSO within 2 & 3 & 2 Months • Starting to prepare codes and guidelines in practice

  5. TSO co-operation in the third package, tasks • Annual work programme and annual report • Network codes • Monitoring of implementation of codes • 10-year network development plan and supply adequacy outlook • every two years • Summer and winter supply outlooks • Network operational tools • Co-ordination of research • Recommendations on technical cooperation between Community and third-country TSOs • Regional co-operation

  6. ACER competences I • Advisory role of ACER On its own initiative or upon request, ACER will give opinions and recommendations to EU institutions on all issues falling within ACER’s competence. • Tasks in relation to TSOs • Involvement in preparation of draft statutes, list of members and draft rules of procedure of the ENTSO. • Involvement in preparation of network codes. • Monitoring of ENTSOs regarding fulfilment of their tasks, in particular implementation of network codes, implementation of interconnectors and network development plans.

  7. ACER competences II • Tasks in relation to NRAs • ACER will replace ERGEG and be the platform for cooperation of NRAs. • Decision-making on cross-border infrastructure, including exemption decisions, if NRAs do not agree • Upon request, check of compliance of NRA decisions with EC energy rules. • Plenty of monitoring and reporting tasks

  8. Organisation of ACER • Administrative Board • Unique composition: 9 members, 5 appointed by Council, 2 by EP and 2 by Cion • Responsible for governance of ACER (Budget, formal appointments, Work Program…) • Board of Regulators (BoR) • Composed of senior representatives from NRAs • BoR decides on the substance, gives guidance to Director • Director • Board of Appeal

  9. Practical info Budget & Staff: About 40-50 people. Annual budget around €6-7 million. ACER will as regards resources depend on work and know-how contributions from NRAs. Seat: Decision expected under CZ or SW presidency. So far, candidates are RO, SK, SL and EL. Director:Selection procedure needs to start in autumn 2009 at the latest.

  10. Network codes • network security and reliability rules; • network connection rules; • third party access rules; • data exchange and settlement rules; • interoperability rules; • operational procedures in an emergency; • capacity allocation and congestion management rules; • rules for trading related to technical and operational provision of network access services and system balancing; • transparency rules; • balancing rules including network related rules on nominations procedure, rules for imbalance charges and rules for operational balancing between TSOs’ systems; • rules regarding harmonised transmission tariff structures; • energy efficiency regarding gas networks.

  11. Network codes 12 months 6 months (2 months consultation) 3 months (opinion of the Agency)

  12. 10-year Network Development Plan • Non-binding • Input from national plan • Not a compilation of national plans • Includes generation adequacy outlook • ENTSO is thinking about a scenario approach • Agency gives an opinion • ENTSO and Agency monitor the implementation • Financing of investments: only national?