1 / 3

MTA – Week3

MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week 5). MTA – Week3. MTA Weekly Report – Week 5. Shielding underneath hatch area is complete Restacking complete on 09/04 Finalizing some safety requirements:

grady-reyes
Télécharger la présentation

MTA – Week3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MTA beam line installation Weekly ReportSeptember 07, 2007Period covered:August 31st to September 7th (Week 5) Shutdown’07 Week 5 F.G. Garcia MTA – Week3

  2. MTA Weekly Report – Week 5 • Shielding underneath hatch area is complete • Restacking complete on 09/04 • Finalizing some safety requirements: • Added cover plates to aid S&S • Retrofit cover plate over the utility penetration • Re-used the slug of concrete to plug in the beam pipe penetration • Electrical Work • Cable pull ongoing • Load cables estimate to finish by Monday • Immediately start pulling instrumentation cables Next week: Continue with cable pull. • Mechanical Installation • All magnets have been stationed in place • Next step will be alignment! • Moving along with MW stands (45% complete). Shutdown’07 Week 5 F.G. Garcia

  3. MTA Weekly Report – Week 5 • Alignment • Outside corner of the concrete blocks were shot by surveyors Next week: Rough alignment starts Monday, Sep 10th • LCW work • Copper pipe installation complete (Linac side) • Brazing/installing taps Next week: Contractors will be moving to the MTA side • Vacuum work • Making as much progress as possible with the assortment of the spool pieces and flanges • Ion pumps stands are complete • Beam pipe support stands are complete Shutdown’07 Week 5 F.G. Garcia

More Related