An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LCav: Low Cost unmanned Aerial Vehicle Status Report # 1 Ryan Morlino Chris Landeros Sylvester Meighan Stephen Verschoyle

  2. LCav providing a low cost control platform for unmanned aerial vehicles. Project Milestones 1.) Construction of Plane Completed 2.) Integrate Stability System into Plane 2/04/07 3.) Integrate GPS module into System 2/13/07 4.) Build Communication Base Station 2/23/07 5.) Testing 3/24/05

  3. Completed Tasks Phase 1: Stability Control • Ordered Sensors (gyros, accelerometers) • Tested Sensors • PCB Stability System Phase 2: UAV Construction • Constructed RC Plane Phase 3: Communication System • Researched Modems Phase 4: GPS Navigation • Ordered GPS modules

  4. Ongoing Tasks Phase 1: Stability Control • Test and Modify PCB Design 2/01/07 Phase 2: UAV Construction • Simulation/Practice Flying 2/03/07 Phase 3: Communication System • Order Modems 1/31/07

  5. Upcoming Tasks Phase 1: Stability Control • Program Servo Controller for 2/03/07 serial Communication Phase 2: UAV Construction • Test Fly RC plane 2/04/07 Phase 3: Communication System • Order set of Modems 1/30/07 Phase 4: GPS Navigation • Test GPS Module 2/01/07