1 / 12

HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY

HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY. Luminosity Polarization Operations Developments Plans. Beam Currents. RF conditioning during injection seems to be successful so far  get to 39mA positron current quickly. Efficiency.

guang
Télécharger la présentation

HERA Status March 2006 HERA-Experiments-Coordination March 28, 2006 F. Willeke, DESY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HERA Status March 2006HERA-Experiments-Coordination March 28, 2006F. Willeke, DESY • Luminosity • Polarization • Operations • Developments • Plans HERA-Experim.-Coord.03/28/06

  2. Beam Currents RF conditioning during injection seems to be successful so far  get to 39mA positron current quickly HERA-Experim.-Coord.03/28/06

  3. Efficiency HERA-Experim.-Coord.03/28/06

  4. Specific Luminosities HERA-Experim.-Coord.03/28/06

  5. Luminosity Production HERA-Experim.-Coord.03/28/06

  6. Polarisation No change w.r.t. last year 30-40 % for the colliding, good polarization for non-colliding bunches Machine interested in flipping rotators one-by-one starting at next maintenance day HERA-Experim.-Coord.03/28/06

  7. H1 Backgrounds: Quick recovery of IR vacuum and gas induced p-backgrounds HERA-Experim.-Coord.03/28/06

  8. ZEUS p Backgrounds:improved by using complementary collimator set HERA-Experim.-Coord.03/28/06

  9. HERMES Target Cellnew target cell is heating up due to HOML‘s during 12GeV positron injection limits e beam intensity at present (~39mA) Synchrotron Radiation heating at 27.5GeV? HERA-Experim.-Coord.03/28/06

  10. Successful commissioning of longitudinal broad band damper system  short bunches (1ns) at 920GeV FWHM=2.8ns Bunchlength FWHM FWHM=1.1ns Beam energy Enhanced emittance growth (IBS, RF noise)  Need more RF voltage Factor of 2 reserve available  needs more work HERA-Experim.-Coord.03/28/06

  11. HERA Week #12 2006 Intergrated Luminosity: 7.9 pb-1 (Z), Peak : Lp 4.68 1031cm-2s-1 Efficiency: 73% ZEUS Backgrouind problems reduced Only minor technical problems HERA-Experim.-Coord.03/28/06

  12. Further Plans • Consolidate operations with high beam currents (>40mA positrons, 100mA protons) and high specific luminosity • Prepare luminosity optics with bxp:2.30, byp=16cm (& matched e-beam) • Use long feedback in routine operation • Increase RF Voltage by a factor of 2 • Increase the number of bunches to 180 to raise the intensity limitation by the HERMES target cell • Explore injection with frequency offset. • Maintenance day April 5 with IR warm-up North (and South?) HERA-Experim.-Coord.03/28/06