150 likes | 284 Vues
This flowchart provides systematic guidelines to improve communication and address challenges in the inspection process. It highlights the significance of clear work order requirements and understanding client specifications to prevent substandard outcomes. Key steps include clarifying suggestions, evaluating human and material resources, selecting the right team and equipment, ensuring proper calibration, and emphasizing the importance of written instructions. The focus is on maintaining high quality without compromising on standards. Always clear doubts and avoid assumptions for successful project execution.
E N D
Communication gap causes substandard inspection OSRS A PPRS ECWI OSRSAnd PPRSEmirates Certified Welding Inspector
O WORK ORDER GET WORK ORDER BY FAX OR MAIL - VERBAL NOT RECOMENDED
S STUDY WORK ORDER
R REQUIREMENT CLEARLY UNDERSTAND THE CLIENT REQUIREMENT
S SUGGESTION & CLARRIFICATION SUGGESTION FOR MOST SUITABLE TECHNIQUE & CLARIFY THE DOUBTS
A ASSUME (ASS U and ME) Never Assume and Reach a Conclusion. Always clear doubts NEVER ASSUME OBVIOUS WHEN OBVIOUS IS NOT OBVIOUS
PROGRAM P NOTE THE DATE IN THE PROGRAM SHEET/ BOARD
P PROCEDURE GET APPLICABLE PROCEDURE & STANDARD
R RESOURCES Evaluate & Finalyse Human &Material Resources
S SUITABLE TEAM Sellect best suitable Team for that particular job
E EQUIPMENT RIGHT EQUIPMENT FOR THE RIGHT JOB
C CALIBRATION FUNCTIONAL CHECK AND CALIBRATION STATUS OF EQUIPMENT
W I WORK INSTRUCTION HAND OVER WORK INSTRUCTION TO THE TEAM The Team should not start the jobe until they get the written WI from the Supervisor
Please remember Never Sacrifice Quality For Quantity DURING ANY OF THE STEPS OF INSPECTION DETECTION EVALUATION & CLASSIFICATION