1 / 23

IST & VMware ESX: What we did

IST & VMware ESX: What we did. Agenda. IST Setup POD design Usage Scalability & Capital Cost Reliability VM as a Service. 2010 | The Sky’s the Limit. Overview. VMware ESXi 4.1 Dell & Netapp. 2010 | The Sky’s the Limit. Pod Design. POD = Compute Nodes + Storage.

Télécharger la présentation

IST & VMware ESX: What we did

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IST & VMware ESX:What we did

  2. Agenda IST Setup POD design Usage Scalability & Capital Cost Reliability VM as a Service 2010 | The Sky’s the Limit

  3. Overview VMware ESXi 4.1 Dell & Netapp 2010 | The Sky’s the Limit

  4. Pod Design POD = Compute Nodes + Storage 2010 | The Sky’s the Limit

  5. Pod Design POD = Compute Nodes + Storage PODS Development 2010 | The Sky’s the Limit

  6. Pod Design POD = Compute Nodes + Storage PODS Development Production – MC (Primary) 2010 | The Sky’s the Limit

  7. Pod Design POD = Compute Nodes + Storage PODS Development Production – MC (Primary) Production – PHY (Secondary) 2010 | The Sky’s the Limit

  8. Compute Detail - Server Embedded boot device LOTS of RAM! 2010 | The Sky’s the Limit

  9. Compute Detail - Network Five 1Gig interfaces 2 interfaces for management 2 interfaces for VM traffic 1 OOB KVM host management 10Gig 2010 | The Sky’s the Limit

  10. Compute Detail - Storage NFS Dedupe = 50% (2:1) 2010 | The Sky’s the Limit

  11. POD Services vMotion SvMotion VMware DRS VMware HA & FT 2010 | The Sky’s the Limit

  12. VM Count Dev = 100 + 12 templates Prod-MC = 40 Prod-PHY = 15 Total = 155 35% Linux, 65% Windows 2010 | The Sky’s the Limit

  13. Dev POD cost - 3 years Dev Servers = 3 * $30K Dev Storage = $60K Total cost = $150K VMs = 100 Simple amortized cost = $500/vm/year 2010 | The Sky’s the Limit

  14. Further Cost Projections Typical VM uses 2.4GB RAM Thus a total of ~200 VM Total cost drops to $250/vm/year 2010 | The Sky’s the Limit

  15. Reliability 95% < X < 100% No data loss Selected service outages Mitigation 2010 | The Sky’s the Limit

  16. Challenges VMware license renewal USB devices Reactive not proactive capacity 2010 | The Sky’s the Limit

  17. VM as a service Why What When 2010 | The Sky’s the Limit

  18. Why – Why not Cost Deployment time Management 2010 | The Sky’s the Limit

  19. What 1-2 vCPU (1.8Ghz) CPU 1-2 GB/RAM 20-40GB storage $600/year 2010 | The Sky’s the Limit

  20. What Part 2 Console access – you can install VM Firewall Load Balancer AC/Power/Monitoring/Security/etc 2010 | The Sky’s the Limit

  21. “SLA” • Best effort 2010 | The Sky’s the Limit

  22. When Now – CEL & IQC already 2010 | The Sky’s the Limit

  23. Questions? 2010 | The Sky’s the Limit

More Related