1 / 3

CKOV Update

CKOV Update. CKOVa/b hardware completed at IIT/Iowa/Mississippi by Sept. CKOVa stored at RAL-R12 for Cosmic test. Aerogel compartments and front window refit after excessive bowing of front window realized. Aerogel will be loaded in to CKOVa/b in early November for cosmic test.

hayes-bauer
Télécharger la présentation

CKOV Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CKOV Update • CKOVa/b hardware completed at IIT/Iowa/Mississippi by Sept. • CKOVa stored at RAL-R12 for Cosmic test. • Aerogel compartments and front window refit after excessive bowing of front window realized. • Aerogel will be loaded in to CKOVa/b in early November for cosmic test. • CKOVb in Mississippi undergoing tests and fitting of reflector panels (page-3). • Mirror production at Fermilab interrupted. Reflector panels will be used at MICE start-up (Jan '08). Performance is good with cosmic data (page-2). • High rate bases performing wll to ~3.5 Mhz • Sanders and Cremaldi to RAL Nov 10-17 to install aerogel and set up at R12. • CKOVa will sit on ground floor at R12 (White Room). • 4 Channels discriminator + HV + ADC(??) available. • TOF0/CKOV stand being prepared by Oxford WL. • CKOVb shipped to RAL in early Nov for Jan'08 installation. PID CKOV CM19

  2. Cosmic Data w Reflector Panels 1pe 12+-1 pe PID CKOV CM19

  3. Refitted Front Window PID CKOV CM19

More Related