1 / 27

Our company

Our company. Voith Hydro Sarajevo , 21 .0 9 .2010. 4877e. History: Voith and Voith Hydro. 4011e. The first steps. Johann Matthäus Voith started as repair mechanic, initially with five employees, servicing paper mills in southern Germany.

hayes
Télécharger la présentation

Our company

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Our company Voith Hydro Sarajevo, 21.09.2010 4877e

  2. History: Voith and Voith Hydro 4011e Presentation | YYYY-MM-DD | 2

  3. The first steps Johann Matthäus Voith started as repair mechanic, initially with five employees, servicing paper mills in southern Germany. 1867January 1st is the official day of the formation of J.M. Voith. Johann Matthäus Voith hands over the business to his son Friedrich. 1870 Start of manufacture of hydraulic turbines. Johann Matthäus Voith Friedrich Voith 4012e Presentation | YYYY-MM-DD | 3

  4. Internationalization and growth • 1903 Founding of J.M. Voith in St. Pölten, Austria. • 1903 First Voith Francis turbine for Niagara Falls. • 1913 Voith supports Viktor Kaplan in the development of the Kaplan turbine, with testing in the “Brunnenmühle“. • 1927 Voith grants S. Morgan Smith of York, USA, a licence for the manufacture of Kaplan turbines. Walther Voith Hermann Voith Hanns Voith 1903 Voith Niagara turbine 4013e Presentation | YYYY-MM-DD | 4

  5. Internationalization and growth • 1945 At the end of World War II Voith‘s employment had shrunk from 4,000 to merely 600. • 1963 Voith Tolosa / Spain established. • 1964 Voith S.A. in São Paulo / Brazil established. Hanns Voith and Konrad Adenauer 4013e Presentation | YYYY-MM-DD | 5

  6. Growth as a result of joint ventures and acquisitions 1983 Take-over of the hydro business of the US market leader Allis Chalmers in York. 1997 The establishment of Voith AG, replacing J.M. Voith GmbH as the Corporate Operative Holding. 2000 Formation of the joint venture Voith Siemens Hydro Power Generation: Voith AG 65%, Siemens AG 35%. 4822e Presentation | YYYY-MM-DD | 6

  7. Milestones 1873 First Voith hydraulic turbine. 1903 First Pelton turbine. 1912 Niagara Falls, Canada: Voith twin Francis turbines with a rating of 12 MW – the largest at the time. 1934 Pedreira, Brazil: First reversible pump-turbine in the world with an output of 5.3 MW. 1938 Sungari, China: The worldwide first 100 MVA generators. 1964 Roenkhausen, Germany: First reversible motor and generator unit in a German pumped storage station. 1969 El Chocon, Argentina: First generator with a stator bore diameter of 16 m. 1970 Raccoon, USA: Largest pumped storage machines in the world at the time, with four 425 MVA units and directly water-cooled stator and rotor. Niagara Raccoon 4018e Presentation | YYYY-MM-DD | 7

  8. Itaipu Itaipu Milestones 1974 Grand Coulee III, USA: The world’s largest and most powerful Francis turbines, with a runner diameter of 9.1 m for an output of 716 MW. 1976 Bath County, USA: The world’s most powerful pump turbines with an output of 458 MW. 1978 Itaipu, Brazil/Paraguay: Complete mechanical design for the world’s most powerful hydroelectric plant (13,300 MW). 1988 Yacyretá, Argentina: The largest and most powerful Kaplan turbines in the Western world rated at 154 MW and featuring a runner diameter of 9.5 m. 4019e Presentation | YYYY-MM-DD | 8

  9. Milestones 1992 Grand Coulee, USA: New water- cooled stators for the largest hydro- electric generator in the world rated at 826 MVA per unit (diameter: 23 m). 1995 First “fish-friendly“ turbine design in the hydro power industry. 1997 Three Gorges, China: Participation in the supply of turbines, generators and electrical equipment for the most powerful hydropower plant in the world currently under construction. 1998 Variable-speed pump turbine tech- nology for Goldisthal. 2000 Guangzhou II, China: Commissioning of the world’s largest pumped storage plant (2,400 MW output). Four pump-turbines and motor-generator units from Voith Siemens Hydro. Sanxia stator frame Grand Coulee GuangzhouII 4020e Presentation | YYYY-MM-DD | 9

  10. Milestones 2002 Tai´an, China: the pumped storage plant has a total output of 1,000 MW and is a major contract in the Asian market. 2003 Omkareshwar, India: supply of eight Francis turbines and generators. This hydropower station is one of the largest in India with a total output of 520 MW. 2003 Longtan, China: supply of five of the seven Francis turbines. With a total output of 4,900 MW it is among the world´s largest hydro power plants. 2004 Laxiwa, China: award for supplying five 711 MW Francis turbines for the biggest hydro project along the Yellow River with over 3 GW capacity. 4911e Presentation | YYYY-MM-DD | 10

  11. Milestones 2004 Kops II, Austria: Three sets of three-stage storage pumps with a rated output of 450 MW – one of the most important pumped- storage plants in Europe. 2004 Goldisthal, Germany: the first variable-speed unit out of a total of four turbines in the most modern European pumped storage plant was going in commercial operation. 2005 Gilgel Gibe II, Ethiopia: award for supplying four 105 MW vertical Pelton turbines and four generators, rated at 125 MVA per unit. 2005 Xiaowan, China: Award for supplying six 714 MW Francis turbines in a consortium. 4043e Presentation | YYYY-MM-DD | 11

  12. Milestones 2006 Caojie, China: Supply of four vertical Kaplan turbines, each with an output of 128 MW and a runner diameter of 9.5 m. 2006 Limberg II, Austria: Pump-turbines for a further new pumped storage plant with a total output of 480 MW. 2006 Rheinfelden, Germany: with four Kaplan bulb turbines (total output of 100 MW) and related generators, the largest investment in renewable energies in Germany. 2007 Jingping II, China: the largest-ever order for Voith Siemens Hydro Shanghai; eight Francis turbines, each rated at 600 MW. 2008 Ohio River, USA: largest order for Voith Siemens Hydro York: supply of the complete electro-mechanical equipment for three run-of-the-river hydroelectric plants. Caojie Limberg II 4834e Presentation | YYYY-MM-DD | 12

  13. Voith Group 4048d Presentation | YYYY-MM-DD | 13

  14. Voith – A company with 39,000 employees • A strong workforce, able to meet big challenges. • Team spirit and professionalism for our customers. • Reliable cooperation spanning all continents. Conowingo Presentation | YYYY-MM-DD | 14

  15. Group Divisions Voith Paper Voith Turbo Voith Hydro Voith IndustrialServices Group Sales 1 743 mio. EUR 1 232 mio. EUR 1 085 mio. EUR 1 018 mio. EUR 5 078 mio. EUR 9 500 5 428 4 681 19 118 38 727 Employees Voith – Sales and employees by division Voith AG Fiscal year 2008/2009 4031e Presentation | YYYY-MM-DD | 15

  16. Voith – Worldwide presence to the customer • More than 280 own production, service and sales locations. • Worldwide Research and Development network. Presentation | YYYY-MM-DD | 16

  17. Voith is innovative • Voith – where smart people like to work. • 11,000 active patents. • 400 new patents every year. • Preference based on innovation. • Investments for Research & Development lie above industry average, with 5% of sales. Presentation | YYYY-MM-DD | 17

  18. The Division Voith Hydro 4022d 4022d Presentation | YYYY-MM-DD | 18

  19. Locations • Europe • Pilsen / Czech Republic • Bucharest / Romania • Podgorica / Montenegro • Europe • Heidenheim / Germany • St. Pölten / Austria • St. Georgen / Austria • Oslo / Norway • Sarpsborg / Norway • Trondheim / Norway • Milan / Italy • Tolosa (Ibarra) / Spain • Inverness / Scotland / UK • Västerås / Sweden • North America • York / PA / USA • Chattanooga / TN / USA • Montreal (Brossard) / QC / Canada • Mississauga / ON / Canada • Asia • Ankara / Turkey • Kawasaki / Japan • Shanghai / China • New Delhi (Noida) / India • Wando / Korea • Latin America • São Paulo / Brazil 4024e Presentation | YYYY-MM-DD | 19

  20. Voith S. Morgan Smith Allis Chalmers Valley Iron Works Ansaldo Riva Hydro-Art Riva-Hydroart Voith Hydro Tosi Fuji Electric / Hydro Siemens / Hydro SHEC Westinghouse Wavegen VG Power Kössler 1928 2007 1950 2007 1980 1986 1923 1958 1973 1900 1901 2000 1877 1928 1990 2006 2007 1994 1996 1850 1867 1881 2005 1992 2002 Growth as a result of acquisitions and joint ventures 4021e Presentation | YYYY-MM-DD | 20

  21. New hydro power plants Enhancement / modernization Model testing Engineering services Supply of hydro power plants and components Installation / commissioning Operations / maintenance Financial support Total solution capabilities – tailored to the owner’s needs 4046d Presentation | YYYY-MM-DD | 21

  22. Voith is fair • Long-term partnerships instead of quick deals. • We commit only what we can deliver. • The customer-relationship is based on the joint performance of Voith’s and the customer’s employees. Presentation | YYYY-MM-DD | 22

  23. Stora Enso(Paper) EnBW(Hydro) Yunnan Power(Hydro) Zanders(Paper) UPM-Kymmene(Paper) Haindl(Paper) Duke Power(Hydro) Palm(Paper) Scheufelen(Paper) 1888 1904 1904 1905 1905 1907 1907 1911 1928 E.ON(Hydro) Fendt(Turbo) Deutsche Stein- kohle AG (Turbo) Voest(Turbo) VEAG(Hydro) Renault(Turbo) MAN(Turbo) Krauss Maffei(Turbo) Bodensee-Schiffsbetriebe(Turbo) 1929 1930 1932 1950 1955 1955 1960 1970 1983 Our partnerships last for generations 4062d Presentation | YYYY-MM-DD | 23

  24. Customer relationships and long lasting partnerships Project Client Current orders First order Yunnan Province Power Shilongba, China 1904 Five 400 MVA-generators for Longkaikou 2008 Duke Power Great Falls, USA 1907 2007 Two 15.6 MW Francis turbines for Bridgewater EnBW Rheinfelden, Germany 1928 Four Kaplan bulb turbines with 25 MW each, as well as generators 2007 E.on Waldeck, Germany 1929 Modernization and new 74 MW- pump turbine/motor-generator 2004- 2007 ENEL Dietro la Torre, Italien 1930 New radial pumps 2007 VEAG Bleiloch, Germany 1932 Two 269 MW-pump turbines as well as automation for Goldisthal 1997 Hokuriku Elecric Power Co. Omata Dam, Japan 1959 New Kaplan turbines and generator 2008 4045d Presentation | YYYY-MM-DD | 24

  25. Canada: La Tuque MercierEastmain Revelstoke Europe: Paalsbu Striven Waldeck Kops II Dychow Mese Limberg II Rheinfelden Eglisau Wehr Lower Olt Akköprü Akköy Sagnfossen Bussolengo Mequinenza La Muela II Georgia: Enguri China: Three Gorges Laxiwa, Tai An Cao Jie, Si Lin Longtan Zhang He WanJingPing IILongkaikou USA: J. Strom, Thurmond Bath County Ohio Falls Wanapum Castaic Conowingo Bonneville Noxon Rapids Ohio River Japan: Toyomi Kaminojiri Iran: Siah Bishe Afghanistan: Sarobi Kajakai Ägypten: Assuan Pakistan: Ghazi Barotha India: Omkareshwar Baglihar Ethiopia: Gilgel Gibe II Malaysia: Cameron Highlands Brazil: Itaipu Peixe Angical Irape Furnas Corumba IV Jauru Capim Branco I Estreito Australia: Gordon River Global projects Russia: Uglich Chile: La Confluencia South Africa: Palmiet Ingula 4855d Presentation | YYYY-MM-DD | 25

  26. Thank you for your attention! Krunić Predrag Sarajevo, 21.09.2010

  27. Presentation | YYYY-MM-DD | 27

More Related