In October of 2002, the IBI Group was retained to undertake an analysis of sustainable building and site development opportunities and make recommendations regarding their incorporation into various aspects of marketing and development of the Bow Valley Centre Lands Redevelopment project.

hayley
Télécharger la présentation

The Bow Valley Centre  14.9 hectares (36.8 acres) Inner city community Bridgeland/Riverside

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. In October of 2002, the IBI Group was retained to undertake an analysis of sustainable building and site development opportunities and make recommendations regarding their incorporation into various aspects of marketing and development of the Bow Valley Centre Lands Redevelopment project.

  2. The Bow Valley Centre 14.9 hectares (36.8 acres) • Inner city community Bridgeland/Riverside • Site of former Calgary General Hospital

  3. Urban village-medium density residential development, mixed use commercial and public open spaces • 1575 residential units • 67,000 sq. ft. of commercial/retail and office use.

  4. Generation of long list of alternatives ( 180) • 2 main categories • Building Structure • Site Development

  5. Building Structure • Under Building Structure there are five sub categories: • - Energy; • Water; • - Health; - Green Building Materials; and - Waste.

  6. Site Development Under Site Development there are three subcategories, including: - Community Planning; - Construction Practices; and - Landscaping.

  7. CURRENTLY REQUIRED CURRENT BLDG PRACTICE ALREADY ADDRESSED IN BVC PLAN TECHNICAL FEASIBILITY UNDER DEVELOPMENT AVAILABILITY TRAINED INSTALLERS/INSPECTORS NOT APPLICABLE PASS Filter #1

  8. ENVIRONMENTAL BENEFITS (L-M-H) COST IMPLICATIONS (L-M-H) NEGATIVE IMPACTS (L-M-H) TECHNICAL FEASIBILITY MARKET ACCEPTANCE PASS Filter #2

  9. As a means of gauging market acceptance it was decided to conduct interviews with knowledgeable builders of multi-family product. • The building interviews were structured to elicit the following information:

  10. Current sustainable practices employed by the builder; • Potential strategies that they believed could be incorporated into a sustainable project;

  11. Market acceptance of sustainable initiatives; • Implementation mechanisms; and • General comments

  12. Short list of sustainable practices subjected to further evaluation • Iterative, some subjective judgement • Suite of alternatives selected $2000 per unit in additional cost

  13. A range of implementation alternatives were considered including: • Mandatory Requirements; • Checklist and Scoring; • Cash Rebate; and • Encouragement/Guidelines

  14. Based on a consideration of pros and cons associated with each of the alternatives, it was decided that a list of specific practices would be mandated for employment on the project.

  15. Sustainable building and development practices secondary marketing advantage • Lifestyle and location aspects primary determinants

  16. Thresholds need to be tested through direct consumer research • More importantly, need for education and awareness

  17. Marketing approach outlining benefits associated with sustainable initiatives • Need to develop objective third party rating and accreditation process for sustainable projects

  18. Sustainable building initiatives proposed for incorporation into the BVC project were evaluated in the context of the LEED Rating System

  19. Project in current state scored 7 of 26 points for certification/33 points for Silver Rating • Addition of IBI Group initiatives scored 20 of 26 points for certification/33 points for Silver Rating

  20. A number of potential additional sustainability measures were recommended that would conceivably allow the project to obtain 33 points/Silver Rating

  21. Total cost to achieve a Silver Rating is estimated at $11,000 per unit or $11 per square foot

  22. Current analysis represents initial step in the incorporation of sustainable practices • Practices proposed should not be viewed as definitive

  23. Review and audit on annual basis • Initiatives expanded upon over time based upon consideration of environmental benefits and associated costs