210 likes | 380 Vues
Robust Digital Right Management Scheme (DRM) for Multimedia. Anuj Maheshwari (atm2104@columbia.edu) Victor Sutan (vs2134@columbia.edu). Presentation Overview. Introduction Project methodology Previous work Plan of action Project Design Flow Conclusion Questions. Introduction.
E N D
Robust Digital Right Management Scheme (DRM) for Multimedia Anuj Maheshwari (atm2104@columbia.edu) Victor Sutan (vs2134@columbia.edu)
Presentation Overview • Introduction • Project methodology • Previous work • Plan of action • Project Design Flow • Conclusion • Questions
Introduction • Motivation: Facilitating control of ownership of multimedia over the internet. Altering existing Digital Rights Management (DRM) schemes • Main issues: • Security • Robustness • Efficiency • Project goal: To have a software that would provide more security and protection features to existing media players.
Project methodology • Concepts used: • Watermarking (focusing on Audio) • Robustness against following attacks: • MPEG Audio compression • Quantization • Filtering • A/D, D/A conversion • Encryption • Cryptographic algorithm (look for this)
Previous work – Steinebach [1] • Audio watermarking and partial encryption [Steinebach2005] • Transparency between watermarked and encrypted data • Need only one key to decrypt / extract watermark • Lack of robustness against format compression
Previous Work – Memon (1998) [2] • Authentication Techniques for Multimedia Content [1] • Many techniques for DRM • Visible / Invisible watermarking (Yeung-Mintzer scheme, Wong scheme) • Fragile / Robust watermarking • Possible Attacks
Previous work – Bassia (1999) [3] • Robust audio watermarking in the time domain • Embedding of information in audio • Robustness against • Lossy compression • Quantization and re-quantization • Low-pass filtering • Results
Plan of Action (I) • Shortcomings of previous DRM schemes • Non robust to: • MPEG compression • Quantization • Filtering • Key issues to be remembered • Security • Efficiency • Robustness
Plan of Action (II) • Robustness issues to be tackled • Most papers use LSB method • Possible problem associated with LSB • Blind retrieval of watermark information • Weighted watermarking to resist attacks from: • Compression • Quantization and Re-Quantization • Other methods?
Plan of Action (III) • Efficiency issues to be tackled • Level of computation required on server side large for encryption and watermark generation • Attempt to move computation to client machine? • Alter the format to allow for appending of watermark?
Plan of Action (IV) • Security issues to be tackled • Investigate other encryption schemes • Allow for less intensive computations • Offer more security than shuffling tables • Allow for minimum probability of random intrusion
Challenges Anticipated • A lot of work has been done • Security • Robustness • Efficiency
Project timeline • April: • Week of 11th: • Finalize project flow • Finalize watermarking and encryption algorithms • Week of 18th: • Implementation of watermarking and encryption • Week of 25th: • Rigorous testing • Preparation of final report • Preparation for final presentation • May • Week of 2nd: • Submission of final report
Conclusions • Come up with alternate DRM • Address the issues of • Robustness • Security • Efficiency
References • [1] Stienebach M., Zmudzinski S., Bolke T. Audio watermarking and partial encryption Security, Steganography and watermarking of multimedia conference VII, Processing of SPIE-IS&T Electronic Imaging, SPIE Vol. 5681, March 2005 • [2] Memon N., Vora P. Authentication Techniques for Multimedia Content , SPIE conference for multimedia systems and applications, SPIE Vol. 3528, Nov. 1998 • [3] Bassia P., Pitas I., Robust Audio Watermarking in the time domain 1999 • [4] Picard J., Robert A., On the Public Key Watermarking Issue Security and Watermarking of Multimedia Contents III, Proceedings of SPIE Vol. 4314, 2001