1 / 7

NEI 04-02 Issues Tracking

NEI 04-02 Issues Tracking. Issues Tracking. Current List Planned Topics Proposed Communication Plan. Issues Tracking – Current (11/05). Method of treating multiple spurious operations (methods and ROP) Approved/Unapproved manual actions for change analysis

heidi
Télécharger la présentation

NEI 04-02 Issues Tracking

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NEI 04-02Issues Tracking

  2. Issues Tracking • Current List • Planned Topics • Proposed Communication Plan

  3. Issues Tracking – Current (11/05) • Method of treating multiple spurious operations (methods and ROP) • Approved/Unapproved manual actions for change analysis • Non-power operational modes transition – No Shutdown Fire PRA

  4. Issues Tracking – Current (11/05) • How to handle NFPA 805 Ch. 3 post-transition changes • Tracking of post-transition changes • PRA Peer Review • NFPA 805 / NEI 00-01 methodology differences during transition

  5. NEI 04-02 PilotsUpcoming Topics for Discussion • Fire PRA Technical Discussion/ANS Standard development and impacts • Enforcement Discretion • Non-Power Operational Modes Transition • Multiple Spurious Operations Expert Panel • T-H Analysis Acceptance Criteria • Recovery Actions • Human Reliability Analysis for Fire

  6. NEI 04-02 PilotsUpcoming Topics for Discussion • Chapter 3 Manual Firefighting • Fire Protection QA Under NFPA 805 • FP Program Change Process • Resolution of NFPA 805 Chapter 3 Issues • Transition Report • Program Documentation • NFPA 805 License Amendment • Interface with Regional Inspectors

  7. Suggested Communication Process

More Related