Presentation Transcript

  1. Dholera Soil Reclamation

  2. Dholera Soil Reclamation • Dholera Soil Reclamation • Erstwhile flourishing Port of Dholera, Gujarat, India • Barren Uncultivable Land • High Soil Salinity • Lack of Drainage

  3. Dholera Soil Reclamation Land Survey Soil Sampling

  4. Dholera Soil Reclamation Soil Sampling

  5. Dholera Soil Reclamation

  6. Dholera Soil Reclamation 5m E D C B A 5m 5m 5m 5m 5m 5m 1% Acid Wash Water Wash

  7. Dholera Soil Reclamation Raised Bed Formation

  8. Dholera Soil Reclamation Water Wash Plot A, B & C

  9. Dholera Soil Reclamation 1% Acid Wash Plot D & E 1% Acid Wash Plot D & E

  10. Dholera Soil Reclamation Control Plot Soil Washing Impound 20kl water 1st~24 hrs Impound 20kl water 2nd~24hrs Impound 20kl water 3rd~24hrs Ploughing 6” soil Allow 24 to 48 hrs sun drying Crop Sown Sesbania sp (green manure crop)

  11. Dholera Soil Reclamation Gypsum Plot Soil Washing Impound 20kl water 1st~24 hrs Impound 20kl water 2nd~24hrs Impound 20kl water 3rd~24hrs Ploughing 6” soil Allow 24 to 48 hrs sun drying Crop Sown Sesbania sp (green manure crop)

  12. Dholera Soil Reclamation Celrich+ Plot Soil Washing Impound 20kl water 1st~24 hrs Impound 20kl water 2nd~24hrs Impound 20kl water 3rd~24hrs Ploughing 6” soil Allow 24 to 48 hrs sun drying Crop Sown Sesbania sp (green manure crop)

  13. Dholera Soil Reclamation 1% Acid Treatment Spraying 100 ltr on surface Soil Washing Impound 20kl water 1st~24 hrs Impound 20kl water 2nd~24hrs Impound 20kl water 3rd~24hrs Celrich+Plot Ploughing 6” soil Allow 24 to 48 hrs sun drying Crop Sown Sesbania sp (green manure crop)

  14. Dholera Soil Reclamation Celrich + Gypsum Plot 1% Acid Treatment Spraying 100 ltr on surface Soil Washing Impound 20kl water 1st~24 hrs Impound 20kl water 2nd~24hrs Impound 20kl water 3rd~24hrs Ploughing 6” soil Allow 24 to 48 hrs sun drying Crop Sown Sesbania sp (green manure crop)

  15. Dholera Soil Reclamation Plot A – Water Wash - Control Plot

  16. Dholera Soil Reclamation Plot B – Water Wash - Gypsum

  17. Dholera Soil Reclamation Plot C – Water Wash - Celrich+

  18. Dholera Soil Reclamation Plot D - 1% Acid Wash – Celrich+

  19. Dholera Soil Reclamation Plot E - 1% Acid Wash – Celrich + Gypsum

  20. Dholera Soil Reclamation

  21. Dholera Soil Reclamation System 1: Big Beds & Channels (BBC) Ideal for areas close to sea, up to about 10 km from the sea and water table is in less than 2 m from the ground 1 m Cropping area Cropping area Slope < 0.8% towards a sub or main drain 10 m 10 m 10 m 50% area can come under cultivation with in 2 to 3 years & increase to 75% over years

  22. Dholera Soil Reclamation System 2: Broad Bed & Furrow (BBF) Ideal for areas beyond 10 km from the sea and water table is more than 2 m from the ground Cropping area Cropping area 1.5 m Cropping area Cropping area Slope < 0.8% towards a sub or main drain Almost 100% area can come under cultivation within 2 to 3 years

  23. Thank You

  24. Dholera Soil Reclamation Project Economics ~ System 1:BBCArea : 50 haProject year : 1st2nd3rd TotalLand Preparation: 37.50 37.50 5000sqm@Rs.25x.6m=Rs.75000x50heSoil Amendment: 5.25 3.50 1.75 10.506T@Rs.3500 per ton x 50heGreen Manure: 0.40 0.40 0.40 1.2040kg@Rs20x50hex3yrCrop Production nil 1.25 1.25 2.50Rs. 2500 x 50heCapacity Building 2.82 1.88 1.88 6.5870day x Rs.5000=Rs.3.5+Rs.1.68Total Cost 45.97 7.03 5.28 58.28Administrative Exp 4.60 0.70 0.53 5.83Project Cost 50.57 7.73 5.81 64.11Main & Sub-drainage cost not included in above estimation

  25. Dholera Soil Reclamation Project Economics ~ System 2:BBFArea : 50 haProject year: 1st2nd3rd Total Rs. in Lacs Rs. in Lacs Rs. in Lacs Rs. in Lacs Land Preparation: 16.25 16.25 10000sqm@Rs.2.5=Rs.25000x50heSoil Amendment: 10.50 7.00 3.50 21.0012T@Rs.3500 per ton x 50heGreen Manure: 0.75 0.75 0.75 2.2575kg@Rs20x50he x3 yrCrop Production nil 2.38 2.38 4.76Rs. 4750 x 50heCapacity Building 2.82 1.88 1.88 6.5870day x Rs.5000=Rs.3.5+Rs.1.68Total Cost 30.32 12.00 8.51 50.83Administrative Exp 3.03 1.20 0.85 5.08Project Cost 33.35 13.21 9.36 55.91Main & Sub-drainage not included in above estimation

  26. Dholera Soil Reclamation • Project Benefits ~ Saline Soil Reclamation Project • Unit System 1: BBC ~ System 2: BBF • Project Cost Rs. in Lacs 64.11 55.91 • Crop Cultivation Rs. In Lacs/ 10 yrs 9.63 18.29 • Interest Rs. in Lacs / 10 yrs 8.18 17.50 • Total Cost 81.91 91.70 • Employment Opportunity 37.50 3.75 • Balance Cost Rs. in Lacs / 10 yrs 44.41 87.95 • Revenue Generation Rs. in Lacs /10 yrs 126.60 253.20 • Net Revenue Rs. in Lacs / 10 yrs 82.19 165.25 • Annualized ROI 18.50% 18.78% • Revolving Fund Rs. in Lacs / 10 yrs 49.26 87.97 • Income Distribution Rs. in Lacs /10 yrs 32.93 77.29