An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dholera Soil Reclamation

  2. Dholera Soil Reclamation • Dholera Soil Reclamation • Erstwhile flourishing Port of Dholera, Gujarat, India • Barren Uncultivable Land • High Soil Salinity • Lack of Drainage

  3. Dholera Soil Reclamation Land Survey Soil Sampling

  4. Dholera Soil Reclamation Soil Sampling

  5. Dholera Soil Reclamation

  6. Dholera Soil Reclamation 5m E D C B A 5m 5m 5m 5m 5m 5m 1% Acid Wash Water Wash

  7. Dholera Soil Reclamation Raised Bed Formation

  8. Dholera Soil Reclamation Water Wash Plot A, B & C

  9. Dholera Soil Reclamation 1% Acid Wash Plot D & E 1% Acid Wash Plot D & E

  10. Dholera Soil Reclamation Control Plot Soil Washing Impound 20kl water 1st~24 hrs Impound 20kl water 2nd~24hrs Impound 20kl water 3rd~24hrs Ploughing 6” soil Allow 24 to 48 hrs sun drying Crop Sown Sesbania sp (green manure crop)

  11. Dholera Soil Reclamation Gypsum Plot Soil Washing Impound 20kl water 1st~24 hrs Impound 20kl water 2nd~24hrs Impound 20kl water 3rd~24hrs Ploughing 6” soil Allow 24 to 48 hrs sun drying Crop Sown Sesbania sp (green manure crop)

  12. Dholera Soil Reclamation Celrich+ Plot Soil Washing Impound 20kl water 1st~24 hrs Impound 20kl water 2nd~24hrs Impound 20kl water 3rd~24hrs Ploughing 6” soil Allow 24 to 48 hrs sun drying Crop Sown Sesbania sp (green manure crop)

  13. Dholera Soil Reclamation 1% Acid Treatment Spraying 100 ltr on surface Soil Washing Impound 20kl water 1st~24 hrs Impound 20kl water 2nd~24hrs Impound 20kl water 3rd~24hrs Celrich+Plot Ploughing 6” soil Allow 24 to 48 hrs sun drying Crop Sown Sesbania sp (green manure crop)

  14. Dholera Soil Reclamation Celrich + Gypsum Plot 1% Acid Treatment Spraying 100 ltr on surface Soil Washing Impound 20kl water 1st~24 hrs Impound 20kl water 2nd~24hrs Impound 20kl water 3rd~24hrs Ploughing 6” soil Allow 24 to 48 hrs sun drying Crop Sown Sesbania sp (green manure crop)

  15. Dholera Soil Reclamation Plot A – Water Wash - Control Plot

  16. Dholera Soil Reclamation Plot B – Water Wash - Gypsum

  17. Dholera Soil Reclamation Plot C – Water Wash - Celrich+

  18. Dholera Soil Reclamation Plot D - 1% Acid Wash – Celrich+

  19. Dholera Soil Reclamation Plot E - 1% Acid Wash – Celrich + Gypsum

  20. Dholera Soil Reclamation

  21. Dholera Soil Reclamation System 1: Big Beds & Channels (BBC) Ideal for areas close to sea, up to about 10 km from the sea and water table is in less than 2 m from the ground 1 m Cropping area Cropping area Slope < 0.8% towards a sub or main drain 10 m 10 m 10 m 50% area can come under cultivation with in 2 to 3 years & increase to 75% over years

  22. Dholera Soil Reclamation System 2: Broad Bed & Furrow (BBF) Ideal for areas beyond 10 km from the sea and water table is more than 2 m from the ground Cropping area Cropping area 1.5 m Cropping area Cropping area Slope < 0.8% towards a sub or main drain Almost 100% area can come under cultivation within 2 to 3 years

  23. Thank You

  24. Dholera Soil Reclamation Project Economics ~ System 1:BBCArea : 50 haProject year : 1st2nd3rd TotalLand Preparation: 37.50 37.50 5000sqm@Rs.25x.6m=Rs.75000x50heSoil Amendment: 5.25 3.50 1.75 10.506T@Rs.3500 per ton x 50heGreen Manure: 0.40 0.40 0.40 1.2040kg@Rs20x50hex3yrCrop Production nil 1.25 1.25 2.50Rs. 2500 x 50heCapacity Building 2.82 1.88 1.88 6.5870day x Rs.5000=Rs.3.5+Rs.1.68Total Cost 45.97 7.03 5.28 58.28Administrative Exp 4.60 0.70 0.53 5.83Project Cost 50.57 7.73 5.81 64.11Main & Sub-drainage cost not included in above estimation

  25. Dholera Soil Reclamation Project Economics ~ System 2:BBFArea : 50 haProject year: 1st2nd3rd Total Rs. in Lacs Rs. in Lacs Rs. in Lacs Rs. in Lacs Land Preparation: 16.25 16.25 10000sqm@Rs.2.5=Rs.25000x50heSoil Amendment: 10.50 7.00 3.50 21.0012T@Rs.3500 per ton x 50heGreen Manure: 0.75 0.75 0.75 2.2575kg@Rs20x50he x3 yrCrop Production nil 2.38 2.38 4.76Rs. 4750 x 50heCapacity Building 2.82 1.88 1.88 6.5870day x Rs.5000=Rs.3.5+Rs.1.68Total Cost 30.32 12.00 8.51 50.83Administrative Exp 3.03 1.20 0.85 5.08Project Cost 33.35 13.21 9.36 55.91Main & Sub-drainage not included in above estimation

  26. Dholera Soil Reclamation • Project Benefits ~ Saline Soil Reclamation Project • Unit System 1: BBC ~ System 2: BBF • Project Cost Rs. in Lacs 64.11 55.91 • Crop Cultivation Rs. In Lacs/ 10 yrs 9.63 18.29 • Interest Rs. in Lacs / 10 yrs 8.18 17.50 • Total Cost 81.91 91.70 • Employment Opportunity 37.50 3.75 • Balance Cost Rs. in Lacs / 10 yrs 44.41 87.95 • Revenue Generation Rs. in Lacs /10 yrs 126.60 253.20 • Net Revenue Rs. in Lacs / 10 yrs 82.19 165.25 • Annualized ROI 18.50% 18.78% • Revolving Fund Rs. in Lacs / 10 yrs 49.26 87.97 • Income Distribution Rs. in Lacs /10 yrs 32.93 77.29