1 / 12

The Project Implementation Place

« Construction of the Greenhouse Complex for Growing Vegetables with the Usage of the Thermal Water on the Basis of the Existent Geothermal Wells in the Village of Medvedevka of Dzhankoy District of the Autonomus Reppublic of Crimea ». The Project Implementation Place.

helene
Télécharger la présentation

The Project Implementation Place

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. «Construction of the Greenhouse Complex for Growing Vegetables with the Usage of the Thermal Water on the Basis of the Existent Geothermal Wells in the Village of Medvedevka of Dzhankoy District of the AutonomusReppublic of Crimea»

  2. The Project Implementation Place • Medvedevka Village Council is an administrative-territorial unit, situated in the Northern part of Dzhankoy District of Crimea, in the steppe area of the peninsula, on the coast of Sivash. Population is about 1,3 thsd. people, area — 182,6 km², the village council was set up in 1930ies.

  3. The Main Concept of the Project • The existent resource – geothermalwell in the Village of Medvedevkaof Dzhankoy District • Prospective usage of the energy: • Heating the social objects of the Village of Medvedevka • Creation of the moderngreenhouse complex with total area of 4 ha (further the expansion is possible) with all-year-round cycle of production in the Village of Medvedevkawith Using the existent natural energy. • Key peculiarity is the high level of innovation involvement, implementation of the resource- andenergy-saving measures, positive influence on the ecological situation

  4. Introduction of the Resource- and Energy-Saving Measures

  5. Positive Ecological Consequences of the Project Implementation • There will be separated and used dissolved in thermal water gas (methane) for generating electrical energy at the gas piston power generating set. The planned according to the preliminary forecasts heat generation for a season in the volume of 2895 Gcal will allow to substitute burning 504 tons of coal per year, what will diminish СО2 emissions in the heating season for 1121 tons. • To decrease the negative influence on the environment in the Project one stipulates СО2 extraction from the fume gas, which is generated during burning coal at the additional boiler room.

  6. The Project Investment Requirements

  7. Details on Investment Costs forFixed Production Assets

  8. Anticipated Schedule of the Project Implementation

  9. Anticipated Indices of Manufacturing Products of the Greenhouse Complex

  10. The Main Indices of the Economic and Social Efficiency of the Project

  11. Indices of the Investment Efficiency of the Project

  12. Thank you for attention! • The Declarant/Applicant of the Project contacts: Dzhankoy region state administration Legal address of the Declarant: Ukraine, the Autonomous Republic of Crimea, Dzhankoy, st. Lenina, 6. Tel./fax (06564)31476 • Support of the project Ministry of Agrarian Policy and Food of the Autonomous Republic of Crimea Simferopol, str. Kyivskaya, 81 (0652) 27-67-10 E-mail:plan_apk@mail.ru

More Related