220 likes | 368 Vues
Reliability-Based Life-Cycle Economic Analysis. Dr Bill Wessels, PE CRE Principal R esearch Scientist UAH Research Institute Reliability & Failure Analysis Lab. Part Alternatives. Five Vendors offer part that meets or exceeds reliability requirements Acquisition Costs A - $6,064
E N D
Reliability-Based Life-Cycle Economic Analysis Dr Bill Wessels, PE CRE Principal Research Scientist UAH Research Institute Reliability & Failure Analysis Lab
Part Alternatives • Five Vendors offer part that meets or exceeds reliability requirements • Acquisition Costs • A - $6,064 • B - $3,803 • C - $5,398 • D - $6,919 • E - $4,376 Dr Bill Wessels PE CRE
Part Failure – MaintenanceCycle Dr Bill Wessels PE CRE
Labor Allocation & Costs/hr – Part Alpha Dr Bill Wessels PE CRE
Labor Allocation & Costs/hr – Parts Beta & Charlie Dr Bill Wessels PE CRE
Labor Allocation & Costs/hr – Parts Delta & Echo Dr Bill Wessels PE CRE
Overhead Costs Dr Bill Wessels PE CRE
Deterministic Part Alternatives Dr Bill Wessels PE CRE
Part A Baseline Simulation Dr Bill Wessels PE CRE
Part B Baseline Simulation Dr Bill Wessels PE CRE
Part C Baseline Simulation Dr Bill Wessels PE CRE
Part D Baseline Simulation Dr Bill Wessels PE CRE
Part E Baseline Simulation Dr Bill Wessels PE CRE
Tests of Hypotheses for Means Dr Bill Wessels PE CRE
Costs Table – Part Alpha Dr Bill Wessels PE CRE
Costs Table – Part Beta Costs Table – Part Charlie Dr Bill Wessels PE CRE
Costs Table – Part Delta Costs Table – Part Echo Dr Bill Wessels PE CRE
Engineering Economic Analysis • rd = APR • n = q • m = CP/yr • i = rd/m • A = uniform cost per hr • PV[A] = PV(i, n, A) • F = S [Costs at n] • PV[F]= PV(i, n,_, F) • NPV = PV[A] + PV[F] • AEquiv = PMT(i, n, NPV) Dr Bill Wessels PE CRE
Part A Life-Cycle Economic Analysis Dr Bill Wessels PE CRE
Part Alternatives Life-Cycle Economic Analyses Dr Bill Wessels PE CRE
Part Alternatives Economic Ranking Dr Bill Wessels PE CRE