An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mobile Facilities Logistics Review Group 2008 LRG Lakehurst

  2. Topics • Lakehurst Team • Loadbank • 3 Ton ECU Procurement • 3 Ton ECU Cooling Cable Upgrade SEC • Mobile Facility Procurement • Frequency Converter • DOD-MEP 100 & 200 Tactical Quiet Generators

  3. Lakehurst Team

  4. Loadbank

  5. Loadbank • Procurement • Contract N68335-03-C-0228 awarded sep 03 to Avtron, inc • Production approval Aug 05 • Controls for load shed • 72 units delivered • No more options available

  6. Loadbank • SERD – MF256 • NSN - 6RD-4920-01-559-1148-SX • Cage - 01014 (Avtron) • Part Number - LPH200D35584 • Type designator - MXU-1004/E • SM&R Code –PEGGG • Value - $12,610

  7. Loadbank * Subject of meeting between LKE and NAVICP 28 May 08 ** Currently establishing training requirements/plan.

  8. 3 Ton ECU Procurement • Contract N68335-06-D-0015 awarded to Environmental Systems 06 Apr 06 • Five-year IDIQ contract for up to 1,000 production (507 units ordered to date) • Apr 06-07 completed: (147) 3 ton units • All delivered • Apr 07-08 completed: (18) 3 ton units, (29) 5 ton units • All delivered • Apr 08-09 current ordering year: (241) 3 ton units • Ordered 23 April, EDD 3 to 4 months • Apr 09-10 • Apr 10-11

  9. 3 Ton ECU Procurement • Technical features • Digital thermostat • R-134A • Liquid charge • Quick disconnect fittings • Access panels

  10. 11/8" COUPLING NUT 1 3/8" COUPLING NUT COMPRESSOR REVERSING VALVE 1 3/8" ROTOLOCKS

  11. 3 Ton ECU Procurement • Technical issues • Continue to track quality issues • Leaky Quick Disconnect fittings? • Contractor is honoring warranty • Contractor has improved process and materials on all future builds • Exceeds current draw on the existing MF cooling circuit • Motor change and name-plating • Did not reduce current draw enough • SEC to MF will address the problem

  12. 3 Ton ECU • SERD - MF250 • NSN -6RW-4920-01-550-2063-SX • Cage – 0V5RA • Part Number - 1559AS400-1 • Type Designator - A/E32C-45A • SM&R Code –PEOGG • Value - $3,500 • Warranty:All warranty issues to be coordinated through Lakehurst (John Schultz)

  13. 3 Ton ECU *Subject of meeting between LKE and NAVICP 28 May 08

  14. 3 Ton ECU Cooling Cable Upgrade SEC • Need for SEC caused by R-134a ECUs requiring 40 amps for cooling circuit • Current MF’s - Heat circuit = 40-amperes ; Cool Circuit = 30-amperes • Increase cool circuit to 40-amperes; new wiring and circuit breaker • SEC incorporation will take place on an attrition basis • Kits will need to be obtained from the kitting activity when installing new R-134a ECUs • Kit will include 40 amp breaker, two 40 amp cables - one from circuit breaker to ECU front panel and one from ECU front panel to terminal board. Kit will also include 6 conductor cable to accommodate the digital thermostat

  15. 3 Ton ECU Cooling Cable Upgrade SEC • Cables coming from circuit breakers will be marked with a band of colored tape at the connector end (Heat RED/Cool BLUE); both same—troubleshooting • Connecter on ECU front panel to be labeled Heat / Cool • Configuration sites will change cables on shelters going through their sites • New shelters will include 40 amp cable.

  16. Cooling Cable Circuit Breaker-ECU Front Panel

  17. Cooling Cable ECU Front Panel-ECU Terminal Board

  18. Thermostat Cable

  19. Thermostat Bracket • Additional Rivnuts will need to be installed in the thermostat bracket to accommodate the digital thermostat that is supplied with the RR-134a ECU. • An additional clearance hole for the thermostat cable will need to be added.

  20. SEC Schedule

  21. MF Procurement • Contract N68335-07-D-0006 awarded to Gichner Shelter Systems 08 Nov 06 • Five-year IDIQ contract for up to 1,000 units (121 ordered to date) • Nov 06-07 completed: 8 MFA, 8 MFB, 4 INU, 69 SOA, 11 SOB • All delivered • Nov 07-08 current: 20 SOA, 1 SOC • Ordered 29 April, EDD 4 to 6 months (ECU Cable SEC incorporated) • Nov 08-09 • Nov 09-10 • Nov 10-11

  22. Frequency Converter

  23. Frequency Converter • Awarded contract N68335-06-D-0010 to Unitron 28 Mar 06 • COTS procurement • Augment to ECU-108 • Five-year IDIQ contract for up to 51 units (3 ordered to date) • Mar 06-07 completed: 1 unit • Delivered • Mar 07-08 completed: 2 units • Delivered • Mar 08-09 current ordering year: • Mar 09-10 • Mar 10-11

  24. Frequency Converter OUTPUT SPECIFICATIONS AND CAPABILITIES • Power rating: 10 kVA at 0.8 PF Lagging • Voltage: 115/200 VAC ± 1%, 3 phase • Frequency: 400 Hz • Current: 29 amps • Overload: 125% of rated load for 5 minutes 175% of rated load for 10 seconds • Efficiency: 85% minimum at full load INPUT SPECIFICATIONS • Voltage range: 120/208 VAC ± 10% • Configuration: 3 phase, wye, 4-wire, grounded neutral • Frequency range: 50 to 60 Hz • Current: 32 amps • Input current distortion: 5% maximum

  25. Frequency Converter • Mechanical and Environmental Specifications • Size: 17.5” H x 19” W x 24” D • Weight: 154 Pounds • Mounting: Rack Mounting • Connectors: • Input – J101 is an MS3102R24-22P and mates with an MS3108R-24-22S • Output – J102 is an MS3102R24-22S and mates with an MS3108R24-22P • Operating Temperature: -25°F to 125°F (-32°C to 52°C)

  26. Frequency Converter • SERD – MF251 • NSN - 6RD-6625-01-552-1659-SX • Cage – 3BC99 (Unitron) • Part Number - 80-18007-1 • Type Designator - ECU-130/F • SM&R Code – PEGGG • Value - $45,000 • Warranty:All warranty issues to be coordinated through Lakehurst (Emil Simodejka)

  27. Frequency Converter *Subject of meeting between LKE and NAVICP 28 May 08

  28. DOD-MEP 100KW TQG Joint program - Army is lead procurement activity

  29. DOD-MEP 100KW TQG Specifications

  30. DOD-MEP 100KW TQG • SERD - MF252 • NSN -2CH-6615-01-296-1463-SX • Cage – 30554 • Part Number - MEP807A • SM&R Code – PEOGG • Value -$60,000 • Warranty – Manual 19-50-26, Work package #23, Pages 1-3 • Also on MF website

  31. DOD-MEP 100KW TQG *Confirmed with CECOM that USMC is a registered user for supply support.

  32. DOD-MEP 200KW TQG Joint program - Army is lead procurement activity

  33. DOD-MEP 200KW TQG Specifications

  34. DOD-MEP 200KW TQG • SERD - MF253 • NSN -2CH-6115-01-296-1462-SX • Cage – 30554 • Part Number - MEP809A • SM&R Code –PEOGD • Value - $80,000 • Warranty:Manual 19-50-28, Work package #23, Pages 1-3 • Also on MF website

  35. DOD-MEP 200KW TQG *Confirmed with CECOM that USMC is a registered user for supply support.