1 / 4

TGp Closing Report

TGp Closing Report. Author:. Date: 2010-01-21. Abstract. TGp closing report for January meetings. January Meetings Summary. Sponsor Ballot #0 close, on 22 November, 93.4 % affirmative 9 time slots during the week

Télécharger la présentation

TGp Closing Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TGp Closing Report Author: Date: 2010-01-21 Lee Armstrong (Armstrong Consulting, Inc.)

  2. Abstract TGp closing report for January meetings Lee Armstrong (Armstrong Consulting, Inc.)

  3. January Meetings Summary • Sponsor Ballot #0 close, on 22 November, 93.4 % affirmative • 9 time slots during the week • Completed resolution of all comments prior to and during the week, resolution document is 11-09/1200r11 • Voted to go to recirculation ballot as soon as possible Lee Armstrong (Armstrong Consulting, Inc.)

  4. Status • D10.0 will be going to recirculation ballot • Weekly teleconferences planned for every Thursday @ 1500 Piscataway time (resuming after recirculation ballot is complete) • Plan is to complete next round of comment resolutions before or during March meetings Lee Armstrong (Armstrong Consulting, Inc.)

More Related