An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1. Main Responsibilities • Corrective Maintenance • Preventive Maintenance • Evolution • Projects for • Navaids • Surveillance • Weather Sensors • Direction Finders Installations spread over the whole country TNE, Christoph Zehnder, 17.2.2004, page 1

  2. 2. Organisation TN 5 technicians 11 technicians 8 engineers 7 technicians 9 technicians Region Zürich: 26 employees Region Geneva: 22 employees TNE, Christoph Zehnder, 17.2.2004, page 2

  3. 3. Installations • 12 ILS (localizer, Glide Path, DME), 3 of them Cat-III • 12 VOR / DVOR • 6 NDB • 5 Direction Finder • 3 Primary Approach Radar • 6 Secondary Radar • 3 SMR • All kind of weather sensors • Self briefing Terminals TNE, Christoph Zehnder, 17.2.2004, page 3

  4. 5. Main ongoing Projects • Mode-S implementation: 6 Stations, in close collaboration with Germany and the Netherlands • Surface Movement and Guidance system for Geneva and Zurich • P-RNAV: implementation of supplementary DME's for Multi-DME navigation • Installation of 2 new ILS for Zurich Airport • Replacement of VOR's TNE, Christoph Zehnder, 17.2.2004, page 4

  5. ILS-Checker Features: • Localizer ground measurement • Glide Path ground measurement • Automatic reports generation • Integrated archiving management • Help for diagnostics TNE, Christoph Zehnder, 17.2.2004, page 5

  6. ILS-Checker Benefits: • Enables systematic correlation between ground measurement and flight checks values. • Gives more weight to ground controls • Would allow us, after an evaluation phase, to reduce the flight checks. • Simplifies ground maintenance procedures TNE, Christoph Zehnder, 17.2.2004, page 6

  7. LLZ Course Structure. COU + CLR. TX1 and TX2 TNE, Christoph Zehnder, 17.2.2004, page 7

  8. End-Fire Glidepath, General Situation TNE, Christoph Zehnder, 17.2.2004, page 8

  9. Test of the sensitive areaMc Donnell Douglas MD 11 TNE, Christoph Zehnder, 17.2.2004, page 9

  10. TNE, Christoph Zehnder, 17.2.2004, page 10