An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Semesterprojekt “timeLine“ Meilenstein 1 Stefan Scheu, Lukas Hollenstein, Sead Bajrami, Samir Alimani, Andreas Hinder

  2. Semesterprojekt “timeLine“ • Rollen • Infrastruktur • Projektplan • Strategieplan • Pflichtenheft Einleitung Stefan Scheu, Lukas Hollenstein, Sead Bajrami, Samir Alimani, Andreas Hinder

  3. Semesterprojekt “timeLine“ • Project Leader: Stefan Scheu • Head Visual Engineering & Usability Engineering:  Andreas Hinder, Lukas Hollenstein • Head Database Engineering, Head Documentation:SamirAlimani • Head Infrastructure- Support & Collaboration: Sead Bajrami Rollen Stefan Scheu, Lukas Hollenstein, Sead Bajrami, Samir Alimani, Andreas Hinder

  4. Semesterprojekt “timeLine“ • Dropbox • SVN/GIT Sever (google-code) • Eclipse • Skype • MySQL Infrastruktur Stefan Scheu, Lukas Hollenstein, Sead Bajrami, Samir Alimani, Andreas Hinder

  5. Semesterprojekt “timeLine“ • Vorbereitung • Verteilung der Aufgaben (Teamchef, Verantwortlichkeiten) • Interview mit Kunden • Planung • Pflichtenheft erstellen • DB vorbereiten/spezifizieren (Welche Datensätze werden benötigt) • GUI vorbereiten ( 1. Version zeichnen/ Besprechen) • Realisierung • DB fertigstellen • GUI fertigstellen • Client- Server Applikation implementieren • Refactoring / Dokumentation • Tests schreiben / Testen Strategieplan Stefan Scheu, Lukas Hollenstein, Sead Bajrami, Samir Alimani, Andreas Hinder

  6. Semesterprojekt “timeLine“ • Refactoring • Bisheriges Ergebnis mit Kunde Besprechen • Dokumentation fertigstellen • Reflexion • Gesamt Reflexion aus Rapporten generieren • Persöhnliche Erfahrungen / Probleme • Release • Datum bestimmen • Pünktlich abliefern Strategieplan Stefan Scheu, Lukas Hollenstein, Sead Bajrami, Samir Alimani, Andreas Hinder

  7. Semesterprojekt “timeLine“ Projektplan Stefan Scheu, Lukas Hollenstein, Sead Bajrami, Samir Alimani, Andreas Hinder

  8. Semesterprojekt “timeLine“ Pflichtenheft Stefan Scheu, Lukas Hollenstein, Sead Bajrami, Samir Alimani, Andreas Hinder