2009 DOE Accelerator Safety Workshop Summary of Presentations and Panels

Closeout. 2009 DOE Accelerator Safety Workshop Summary of Presentations and Panels. Schedule Outline. Summary of Presentations. Paraphrased Quick walk down memory lane. Fermi Lab Assessment – Scott Davis. Opportunities for improvement in the accelerator safety documentation

huey
Télécharger la présentation

2009 DOE Accelerator Safety Workshop Summary of Presentations and Panels

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Closeout 2009 DOE Accelerator Safety WorkshopSummary of Presentations and Panels

  2. Schedule Outline

  3. Summary of Presentations • Paraphrased • Quick walk down memory lane

  4. Fermi Lab Assessment – Scott Davis • Opportunities for improvement in the accelerator safety documentation • Recommended better consistency and control of documentation • Good findings • Tracking training for personnel • Safety culture • FSO Oversight Program

  5. ASO Revision Process – Scott Davis • Develop a minimum set of requirements • Discuss approaches at Accelerator Safety Workshop • Provide changes to the accelerator community as soon as practical • Request comments from the accelerator community • Prepare Justification Memorandum by September 30, 2009

  6. The End State – Scott Davis • Performance based contracts with the right “requirements set” • External regulation of safety • Fully developed contractor assurance systems • DOE Contract Management replaced by DOE Performance Management • 2 to 3 year time frame

  7. NSLS Experiment ESH Review – Andrew Ackerman • Formal documented process • Electronic submissions by user • NSLS liaisons assigned and ESH reviewed with user • Authorizations required to start • Beam line safety checklist developed • Training of users checked • Efficient web based training • Hands on training at beam-line • Training records maintained • Experiment begins

  8. User Training APS – Steve Butala • APS core courses available remotely via web • Training determined by experiment safety analysis or • Training determined by job hazard questionnaire • Lecture and practical training for several hazards • Training verified • Training records maintained • Experiment is authorized by signatures; posted at beam line

  9. Large Experiment Collaboration Structure and Training at FNAL – Don Cossairt • Large user collaborations (100s to 1000s) • Experiments are institutions (procedures, policies) • Formal MOUs including ESH section with FNAL • ESH policies are same for FNAL employees and FNAL users • Individual training needs assessments performed • Web based, lecture and hands on training are in use • Centralized ESH training where practicable • Records maintained • Language is a challenge • Keeping user training current is a challenge

  10. 851 Exposure Assessment – Jim Floyd • Three tiered system proposed at LBNL • Hazard identification using risk based screening • Qualitative assessment and professional judgment • Quantitative assessment determined by decision tool

  11. IH Monitoring Issues at Accelerators – Jim Floyd • Nano – need technical basis for sampling • Nano – need standards for measurement interpretation • Nuisance noise – when do you mitigate? • Lasers – portability of third party eye exams • ODH issues in labs – probability of event is low

  12. DOE Accelerator Software and QA – Matt Cole • Pick a standard or combination of standards • Map to the 10 DOE QA criteria • Address the integration of software with hardware and humans • Establish effective configuration management • Periodically assess • Share experiences

  13. Draft DOE Standard Application Of Safety Instrumented Systems Used At DOE Non-reactor Nuclear Facilities – Asher Etkin • There is a lot of useful material in this standard • For the accelerator community to benefit, we must extract useful material into a separate guidance document

  14. Metals Suspension, Moratorium – Sayed Rokni, George Goode • Accelerator community and Office of Science must engage in the process to lift the moratorium and develop workable solutions to this problem • SC and/or contractor staff should participate in the Los Alamos visit as observers and share lessons learned • Accelerator community should form a working group to develop a consensus position regarding lifting the moratorium and for review/comment in REVCOM of the revised DOE O 5400.5 

  15. Update on Metals Recycling at DOE Facilities – Don Gregory • Use alternative approaches • Re-use • Common sense agreements with DOE • Retroactive de-posting • Issue has the attention of the Secretary of Energy

  16. SNS Modulator Fires – David Anderson • Many “smoke generating” events to date • Nature of component failures well understood • PM and component replacement underway

  17. BNL S-band LINAC Fire Safety Concerns – Andrew Ackerman • Three similar fires, 1999, 2003, 2009 – 3 BNL accelerators • Understood the systems and the risks they present • Identified controls (fire or arc detection, procedures, disconnects) • Larger open issues: • Sharing information and resources at BNL • Implementing complete and consistent corrective actions • Establishing standards for equipment design and maintenance

  18. NFPA 101-2009 – E. Michael Saleski • Typical accelerator enclosure hardware does not meet standard • Time delay release with audible alarm may be an acceptable solution

  19. Contractors' Internal Self-Assessment Programs that Meet ASO Requirements • BNL, ANL, ORNL, FNAL, TJNAF, SLAC, LBNL meet ASO requirements • Approaches vary

  20. Human Performance Initiatives, ORNL and BNL - Sam McKenzie and Ray Karol • Human performance initiatives take several years to implement • Consultants and motivated employees should be involved in startup • Culpability schemes are useful • Error reduction in all business areas can be experienced, not just safety • HPI tools and training are maturing

  21. Panel Sessions • What is the Appropriate Role of the Accelerator Safety Order? • Views of contractors and DOE were expressed • Contractors support the Order • Recent Accelerator Events and Lessons Learned • Modifications to RHIC after the CERN Event, J. Tuozzolo • Latent hazardous conditions at RHIC were discussed • Radioactivity release at Holifield, B. A. Tatum • Improvements to maintenance program, radiological surveillance program, SAD and emergency response were discussed

More Related