1 / 10

How to help NC in working towards network for the future

How to help NC in working towards network for the future. Based on dialogue with the Danish NC and Danish DNO’s and the Chairmen in the NRCC (all countries with many small DNO an few large) Cigré has an image of ”transmission only” I think we need a stronger signal from AC to the NC’s

hugh
Télécharger la présentation

How to help NC in working towards network for the future

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How to help NC in working towards network for the future • Based on dialogue with the Danish NC and Danish DNO’s and the Chairmen in the NRCC (all countries with many small DNO an few large) • Cigré has an image of ”transmission only” • I think we need a stronger signal from AC to the NC’s • Klaus Fröhlichs presentation shown in Perth would be a good baseline for the discussion in AC • Cigré need to clarify what we want with the agreement with CIRED • Discussion on Forum for National Committees in august 2012 • We need a overview on actual activities (WG’s) related to Network for the future • 2 page ”sales flyer” (Could Central office help) • Benefits from participating in WG’s (Description from the TC website) • Selected results from recent WG’s Forfatter - Titel

  2. Forfatter - Titel

  3. Forfatter - Titel

  4. CIRED 2011 conference • Session 1 Network Components • Asset management, • Innovative network components and solutions for SG, • Evolution of standards…., • Trends i Network components for substations • Session 2: POWER QUALITY AND EMC • ”Electromagnetic interference, electric and magnetic fields and grounding systems” • Steady-state disturbances, • Disturbing events, • Power Quality in a competitive market • Session 3: Operation, control and protection • Operation • Control and automation • Protection, (SG and dispersed generation) Forfatter - Titel

  5. Session 4 -6 main topic • Session 4: Distributed Energy resources & efficient utilisation of electricity • DG/DER planning and studies • Control of networks with DG/DER • Customer-side developments • DG/DER Technology • Session 5: Planning and system development • Asset management • Network development • Planning • New tools for modelling • Session 6: Distributions Business and impact of regulation • Smart Grid and regulation • Smart Metering • Demand response • ICT and other topic Forfatter - Titel

  6. Cigre participation on next CIRED conference (Stockholm 2013) • There have been a dialogue with the President and TC Chairman • It’s seems like there is a little resistance or concerns on having Cigré exposed on the Cigré conference • There is an opening on making a joint Roundtable session between Cired and Cigré – CIRED TC are discussing that on at meeting in this week. • My proposal for Cigré contributions to at Joint roundtable • Cigré contribution on a Component related topic • Cigré contribution on Network for the future • CIRED 1 • CIRED 2 • Maybe to close with announcing a joint WG? Forfatter - Titel

  7. Forfatter - Titel

  8. Action plan for implementing Network on the future TC project • Given the tree work areas • Large networks (super grid ect.) – Cigré is probably the most obvious organisation to work with that area • Small Networks – No clear definition, Does other SC’s than C6 really cover that topic? • Better utilization of existing assets on all voltage levels – Cigré has the knowledge on Transmission components. But what about components for “small networks”? • Lets make a short overview of (Based on the Excel sheet from the SC chairmen) • Overview of running WG related to Network for the Future • Mapping of activities related to: TI1 to TI10 input from all SC’s Forfatter - Titel

  9. Action plan for implementing Network on the future TC project • Need for visibility • Can we make Cigré and TC activities visible in the Smart Grid Community? • Selection of a few Cigre’ key findings to be promoted – To make Cigre visible in the Smart Grid Community • Discussion issue: • Should ”small network” and “distribution voltage components” issues generally be included in new WG’s in all SC’s? • Should each SC’s try to identify specific WG’s for ”Small Network” or “distribution voltage components” issues? Forfatter - Titel

  10. Jørgen S. Christensen jsc@danskenergi.dk

More Related