This assessment outlines the Phase 1 completion of the Mastergoal project at Kansas State University, led by Alejandro Alliana. It details deliverables, including vision documents, project plans, and software quality assurance strategies for a prototype board game with discrete states that incorporates machine learning techniques. The project aims to create an environment for experimenting with AI strategies, addressing challenges in traditional approaches and exploring modern techniques like reinforcement learning. Additionally, it discusses project management, testing standards, and cost estimation methodologies such as COCOMO.

1 / 34

Télécharger la présentation

Mastergoal Machine Learning Environment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mastergoal Machine Learning Environment Phase 1 Completion Assessment MSE Project Kansas State University Alejandro Alliana

  2. Deliverables • Vision Document v 0.1.0 • Project Plan 0.1.0 • Software Quality Assurance Plan 0.1.0 • Prototype

  3. Mastergoal • Board game with discrete states. • Played at different levels. • High branching factor. • New in AI research.

  4. Project Goals • Provide an environment to create, repeat, save experiments for creating strategies for playing Mastergoal using ML techniques. • Try different AI techniques in the environment of the game

  5. Background • Traditional approaches • Search in the state space S applying actions A(st) to the states and Evaluating the generated states st+1 using a hand crafted evaluation function • Reinforcement Learning • Unsupervised learning. • Temporal difference learning. • Successful with Backgammon. • Problems with some games such as Chess and Go. • TD-Leaf, TD(μ)

  6. Risks • Inexperience with some algorithms and programming language • Exploration vs. exploitation • Computational Cost of Evaluation Functions • Quality

  7. Prototypes demonstration

  8. Constraints • Export strategies to be used in the Mastergoal plugin environment. • CPP programming language

  9. Requirements • Experiment Management • Training strategy • Export Strategy • Explore game

  10. System Components

  11. Experiment Management

  12. Other Use Cases

  13. Documentation standards • UML Diagrams • Scenario description • Coding Standards following the C++ standards • Commentary standards following Code Conventions for the Java Programming Language.

  14. Testing Standards • Unit testing • CppTest • Component testing • Integration Testing • Performance Testing • Testing plan

  15. Version Control • SVN Repository • Maven directory Structure standard • Tortoise SVN Client

  16. Tools • IDE • Microsoft Visual Studio • Modeling • Rational Rose • Gliffy.com • Documentation • Microsoft Word • Code control • Tortoise SVN • Managing • Process Dashboard • Microsoft Project

  17. Cost Estimate • COCOMO • COCOMO II • Use case points

  18. COCOMO • Effort = 3.2 EAF (Size) 1.05 • Time = 2.5 (Effort) 0.38 • Where: • Effort is the number of staff months • EAF is the product of 15 effort adjustment factors. • Size is the number of delivered source instructions in KLOC.

  19. Cocomo – Effort Adjustment factors

  20. COCOMO Estimate • Estimated KLOC (7.5) • Effort = 3.2 (1.18) (7.5) 1.05 • Effort= 31.32 staff months • Time = 2.5 (Effort) 0.38 • Time = 9.25 months

  21. COCOMO II • COCOMO II defines three models for cost estimation: • Applications composition model • Early design model • Post-Architecture model.

  22. Application Composition Model • Assess Object-Counts • Classify each object instance into simple, medium and difficult and weight them. • Determine Object-Points • Estimate percentage of reuse • Determine a productivity rate • Compute the estimated person-months

  23. Application Composition Model • PM = 39/7 = 5.57 Person months • (2.25 ~ 11.07 months)

  24. Early Design Model • Effort = 2.45 EArch (Size)P • Where: • Effort = number of staff-moths • EArch = is the product of seven early design effort adjustment factors • Size = number of function points or KLOC • P are the scaling factors.

  25. Post Architecture model • Effort = 2.45 (Eapp) (Size)P • Effort = number of staff-moths • EArch = is the product of seventeen post architecture effort adjustment factors • Size = number of function points or KLOC • P = process exponent, same as the early design model. • Effort = 33.99 staff months • Time = 9.54 months (7.632 ~ 11.93)

  26. Project Schedule

  27. Phase Two Deliverables • Vision document • Project Plan • Test Plan • Architecture Design • Formal Requirements Specification • Formal Technical Inspection • Executable Architecture Prototype.

  28. End of presentation • Questions

  29. Application Composition Model

  30. Scaling factors

  31. Frameworks Studied • Knight Cap • Neuro Draugths • RL Glue