1 / 7

Photovoltaic Developers Perspective Photovoltaic and Storage Workshop ERCOT

Photovoltaic Developers Perspective Photovoltaic and Storage Workshop ERCOT Aruna Ranaweera, Ph.D., P.E. OCI Solar Power. October 15, 2012. OCI Solar Power. ($00). Headquartered in San Antonio Utility scale solar power development throughout the US 400 MW Solar PPA with CPS Energy

hugh
Télécharger la présentation

Photovoltaic Developers Perspective Photovoltaic and Storage Workshop ERCOT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Photovoltaic Developers Perspective Photovoltaic and Storage Workshop ERCOT Aruna Ranaweera, Ph.D., P.E. OCI Solar Power October 15, 2012

  2. OCI Solar Power ($00) • Headquartered in San Antonio • Utility scale solar power development throughout the US • 400 MW Solar PPA with CPS Energy • Consortium of companies to create 800+ solar industry jobs in San Antonio • Stage I: 50 MW to be in service in 2013 • Interconnection studies in progress with ERCOT and CPS • Stages II to V from 2014 to 2016 • Committed to the reliable operation of the electric power system

  3. Integration of Solar Power ($00) • Studies to show that concerns are not just speculation • And understand issues correctly to implement proper mitigations • Location specific issues (related to POI) • Issues due to the size of the plant • Centralized mitigations and individual plant mitigations • Solar power forecasting by each plant and centralized forecasting managed by the Reliability Coordinator • Other RTO practices • Impact of new requirements on the competitiveness of solar power

  4. Generation Interconnection Process Feedback ($00) • Clear application instructions: Submit Resource Registration form before the Interconnection Application? • Interconnection queue update frequency • Examples of other RTO practices: • MISO - Pre-queue workshops several times a year • PJM, MISO, CAISO, ISO-NE, NYISO - Interconnection Queue posted on the public website

  5. Generation Interconnection Process Feedback ($00) • Other RTO practices: Interconnection Queue map posted on public website

  6. Generation Interconnection Process Feedback ($00) • Other RTO practices: Interconnection Capacity map posted on public website

  7. Generation Interconnection Process Feedback ($00) • Maps available on the state website