90 likes | 223 Vues
During the Senior Design SR22 meeting on September 28, 2011, key objectives were established, including finalizing deliverables for the Preliminary Design Review (PDR) and preparing a presentation for the upcoming trip on Tuesday. Team members were reminded of project deadlines, with deliverables such as a concept sketch due by September 29 at 11:30 PM. Each group will focus on specific tasks to ensure metrics like performance estimates and trade-off analysis meet requirements. The strategy aims to complete an all-inclusive design by October 17.
E N D
Senior Design SR22 Canard September 28, 2011
Meeting Objectives • Decide on deliverables for PDR (20min) • Establish a presentation for Tuesdays Trip (20min) • Decide on objectives for coming weeks (10min)
Meeting Schedule • Reminder on current projects deadlines and objectives • Deliverables • Presentation • Objectives for coming weeks
Weeks Update • Presentations on Monday • Concept Sketch - Due Thursday September 29th at 11:30PM - 3 view - Trade-off analysis - Email schum313@umn.edu your scans of the 3 view and/or power point - Review schedule and last meetings notes for how the presentation guidelines
Deliverables for PDR • 3 View • Performance Estimates • Trade-off analysis
B+ Objectives • Meet all requirements • CAD Models • Trade-off Analysis / Trade Study • Performance Estimates • Stability Estimates
A+ Goals • High Performance Model • See meeting minutes
Presentation for Cirrus Trip • Presentation should be a power point • No more than 10 slides total • Brief update (remember he is getting updates from me) • Leader for Trip: Chris Erickson
Objectives for coming weeks • Overall Strategy is to have the initial (all inclusive design) done for October 17 class • Breaking up into groups of four to work on designs • What, Who, WHEN