1 / 11

Mesh Networking Task Group Process

This document provides an overview of the process followed by the Mesh Networking Task Group, including the adoption of PAR and 5 criteria, technical presentations and discussions, the selection and combination of proposals, and the refinement of drafts.

husted
Télécharger la présentation

Mesh Networking Task Group Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mesh NetworkingTask Group Process Donald E. Eastlake 3rd <Donald.Eastlake@motorola.com> <dee3@torque.pothole.com> +1-508-786-7554 ESS MESH FREE IEEE 802.11 the APs Donald Eastlake 3rd, Motorola

  2. Generic Process of Getting toLetter Ballot • Adoption of PAR and 5 Criteria • Technical Presentations and Discussions • Specify Any Additional Requirements and Comparison Criteria • Call For Proposals • Select/Combine from Submitted Complete/Partial Proposals to Produce a Draft • Refine Draft • Letter Ballot Donald Eastlake 3rd, Motorola

  3. 802.11 Example Project Histories (Figure above by Bruce Kramer.) 11s 24-Jun-04 May/July 05 Donald Eastlake 3rd, Motorola

  4. Goals for July 2004 MeetingAdopted By ESS Mesh SG in May • July (Portland, Oregon) • Adopt Initial Definitions document • Usage Cases and Functional Requirements discussion • Architecture Presentations • Other ad-hoc subgroup results and Presentations • Joint Meeting with 802.11r, etc. Donald Eastlake 3rd, Motorola

  5. Future Schedule as Discussedat May 2004 Meeting • September 2004 (Berlin, German) • Adopt Functional Requirements / Evaluation Criteria document • Approve Skeleton “Draft” 0.0 • Other ad-hoc subgroup results • Call for Proposals issued immediately after meeting with deadline for submission of two weeks before the November meeting. • November 2004 (San Antonio, Texas) • Presentation of Proposals • January 2005 (Monterey, California) • Condensation of Proposals -> Draft 0.1 • March 2005 (Atlanta, Georgia) • Refinement of Draft • (May 2005 (Sydney, Australia) • Letter Ballot Authorized?) Donald Eastlake 3rd, Motorola

  6. Ad Hoc Subgroups andInternal TGs Actions • Ad Hoc Subgroups • Have no special status unless TGs votes on them or their output. • Any group of 802.11 members can get together and make submissions. • Within the P&Ps (RRONR, notice for meetings and Teleconferences), we can do what we want internally: • “Adopted” internal TGs motions/documents can be amended by majority with notice (i.e., if change is on agenda) or 2/3 vote without notice. • We can issue a call for proposals • With no requirements other than the PAR & 5 Criteria • With some guidelines • With detailed requirements • We can have “Functional Requirements Document” that is a general or specific as we like. Donald Eastlake 3rd, Motorola

  7. Ad Hoc Subgroups • Informal ad-hoc subgroups: • Usage Cases – coordinator Steve Conner <w.steven.conner@intel.com> • “Usage Models”, 11-04/764r1 and 11-04/662r7 • Definitions – coordinator Tricci So <tricciso@tadiantzone.com> • “Draft Terms and Definitions for 802.11s”, 11-04/730r1 • Informants re Other 802.11 standards/drafts/study groups • 802.1ae, 802.1af /Security – coordinator Bob Moskowitz <rgm@trusecure.com> • “802.11s Security Proposal”, 11-04/777r0 • 802.11k, 802.11h /Radio Resources/Metrics – coordinator • WNM, CAPWAP /Management – coordinator Donald Eastlake 3rd, Motorola

  8. Ad Hoc Subgroups • Informal ad-hoc subgroups (cont.): • Routing – coordinator Tyan-Shu Jou <tsjou@janusysnetworks.com> • “802.11s Routing Sub-Group Discussion on May 04”, 11-04/765r0 • Quality of Service – coordinator Lily Yang • Security – coordinator Jasmeet Chhabra <jasmeet.chhabra@intel.com> • The above groups may be using the following wiki page: • http://ieee.comnets.rwth-aachen.de/cgi-bin/wiki.pl?/AdHocGroups Donald Eastlake 3rd, Motorola

  9. Ad Hoc Subgroups • Some Possible Dispositions of Subgroup Output Documents (as amended if desired) • No action • Include in a TGs adopted “Recommended Reading List” • Adopt as an internal working paper • Adopt as mandatory for proposal conformance Donald Eastlake 3rd, Motorola

  10. Calling for Proposals in September? • If a call for proposals is to be issued shortly after the September meeting, we should issue a warning at this meeting that we plan to do that. • Proposals obviously must conform to the PAR and 5 Criteria. • Will we have a Functional Requirements or Evaluation Criteria Document? • What other documents, if any, should be referenced by the Call for Proposals? Donald Eastlake 3rd, Motorola

  11. Possibilities to Accelerate TGs • Possibilities for TGs Between July and September Meetings to accelerate action on, for example, a Functional Requirements document: • Nothing • One Teleconference • Ad-hoc face to face meeting (requires 30 days notice) • Multiple Teleconferences (requires 10 days notice) Donald Eastlake 3rd, Motorola

More Related