1 / 8

Dmitry Malyshev Consultant to Czech - Russian Consortium ...

Dmitry Malyshev Consultant to Czech - Russian Consortium . The highest economic and legal education. Doctor of Economics. 1996  founded and directed the investment company. From 1999 worked for the reform of the Russian electric power industry. From 2002, the consultant to Gazprom .

huy
Télécharger la présentation

Dmitry Malyshev Consultant to Czech - Russian Consortium ...

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dmitry Malyshev Consultant to Czech-Russian Consortium ... • The highest economic and legal education. Doctor of Economics. • 1996  founded and directed the investment company. • From 1999 worked for the reform of the Russian electric power industry. • From 2002, the consultant to Gazprom . • Developed the concept of liberalization of the gas market in Russia. • 2003 Managed acquisition of Kaunas Thermal Power Plant (Lithuania). • From 2006 adviser to the president of GazpromNeft. • Led the acquisition of 51% stake in Naftnaindustriјa Srbiјe  (Oil Industry of Serbia).  • First russian Chairman of the Board of Directors Naftnaindustriјa Srbiјe. • Advisor to the Chairman of the Board of IDGC Holding. • Member of the Board of Directors of several companies of Inter RAO UES. • Consultant to Czech-Russian Consortium ...

  2. Potential vector of energy industry in Europe • Shifting of energy balance in favor of more expensive “green” energy due to rejection of nuclear energy generation by a list of countries and efforts to improve ecological situation. • Rapid energy price growth will have negative effect on the international competitiveness of European goods. • There will be potential lack of capacity in Europe to 2020. Source: RWE data Development of new NPP capacity will help Czech republic to become the key player on the regional market, secure national energy supply and limit energy price growth. 2 Source: RWE data

  3. Tender for construstion of Temelin NPP, Units 3&4 Tender Bidders Key parameters Sponsor: CEZ Financial adviser: BNP Paribas Contract:EPC (incl. fuel supply) Construction period: 2017-2023 Tender period: November 2011- July 2012 Announcement of results: July 2013 AREVA (France) Czech-Russian Consortium SkodaJS(Czech Republic) JSC Atomstroyexport(Russia) JSC OKB Gidropress (Russia) Westinghouse (USA-Japan) MIR.1200 (VVER-1200) EPR-1650 AP-1000 Project milestones 2017 17 February2010 2 November2011 2 July2012 2013 3 August2009 2022 2023 Unit 3 Announcement of project start Tender start Bid submission Unit 4 Results announcement, award of contract Consortium, Areva andWestinghouse pass qualification Construction license

  4. Existing Czech NPPs are made on the basis of Russian VVER technology. Russia and Czech republic have been partner in the nuclear energy field for a long period of time Škoda JSandRosatom are sustainable partners with good track record. They can mitigate Project risks on the construction phase. Consumer position in the nuclear fuel market has become significantly stronger. Potential collaboration of Škoda JSandRosatomis not limited by Temelin NPP project • Nuclear fuel market has become more competitive. NPP constructor has no more monopoly for fuel supply (i.e. Westinghouse had supplied fuel for 1-2 units of Temelin NPP till 2010. • ČEZhas long and positive experience of VVER reactors operation. • VVER technology is well-known to Škoda JS • Škoda JS и Rosatom are sustainable partners well appraised internationally 4

  5. Temelin NPP (units 1&2), Czech Republic Temelin NPP • Comments • Units 1&2 of Temelin NPP were constructed using Russian project by Czech and Slovak companies which used the same principles as MIR.1200 proposal made by Czech-Russian consortium. • Temelin NPP has VVER-1000 reactors and uses Russian fuel. • Temelin NPP is being operated by Czech company -CEZ. • In 2009 the decision to build additional units 3&4 was announced. • working unit • planned to be built unit

  6. Czech-Russian consortium combines superior competencies of Czech and Russian nuclear industry • ŠKODA JS a.s. (Czech Republic), Consortium leader • One of the leading Czech companies in engineering and equipment production. • Made 21 set PWR-reactors with capacity of 440 MW and 3 units with capacityof 1000 MW. • General Contractor in Czech and Slovak projects. • Skoda has necessary competencies in producing the key elements of nuclear island and controlling the construction and APCS implementation. JSC Atomstroyexport(Russia) • Leading engineering company in Russian nuclear industry. • Develops Rosatom NPP construction projects all around the world. • More than 50 year experience in Russian nuclear industry. • Build NPPs of new generation which comply with international requirements and IAEA recommendations. • JSC OKB Gidropress(Russia) • Main designer and holder of nuclear island “know-how” in MIR.1200 project. • Designs made by GIDROPRESS are known for enhanced security, sustainability, efficiency and competitiveness in Russia and abroad. • Is in charge of design, calculations, theoretical and experimental research of nuclear island for NPP based on VVER reactor. • Reactor VVER-1200 • PWR Technology. • Generation III+. • 6reactors are under construction in Russia and 8 reactors - abroad. 6

  7. Consortium’s “know how” Extra 5 bln. Euro income for Czech companies (e.g. up to 20 bln. multiple effect on economics) 10000+ job places Maximizing supply of Czech companies 7

  8. Potential local suppliers of Consortium are top players of Czech Power industry I&C: • IC Energo • ZAT, ENVINET andCHEMCOMEX High and Low pressure heat exchangers: VÍTKOVICE PE Steam generators: VÍTKOVICE PE Pressurizer:VITKOVICE PE Electrical systems: I&C Energo High pressure vessels: SKODA JS Engineering Auxiliary prime and secondary systems: Kralovoplska RIA, ČKD, CHEMCOMEX Polar crane: SKODA JS Labs I&C Lab equipment and tools: ENVINET Cooling tower: ChladicivezePraha Valves Arako, MPOWER Engineering, MODRANY POWER Civilconstruction Vent and air conditioning • Vent and air • conditioning: ZVVZ Enven-Engineering Civil contraction: Metrostav PSG Hochtief Pumps: SIGMA GROUP Pumps SIGMA GROUP