1 / 8

Jones Manufacturing Company

Jones Manufacturing Company. Aicha Thiam, Daniel Pugh, Nathan Palmer, Jamie Munger, and Douglas Ashburn MBA 513. Current Process Map. Solution A. Reduce lot size…. Changes the cycle time but not enough

Télécharger la présentation

Jones Manufacturing Company

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Jones Manufacturing Company Aicha Thiam, Daniel Pugh, Nathan Palmer, Jamie Munger, and Douglas Ashburn MBA 513

  2. Current Process Map

  3. Solution A • Reduce lot size…. Changes the cycle time but not enough • The problem is with the “informational downtime” involved with moving the parts: work orders, scheduling, etc… • Introduce a “load- and go-” system

  4. Solution B • Same chaotic movement of the forklifts around the factory • Solution: • Create an “assembly-line” setup in the unused space

  5. New Process Map

  6. Pros: • Increase to capacity does not require more forklifts/drivers • Cost per bracket would be reduced • Cons: • Time to establish new system may exceed time allotted • Reduced flexibility for the Small Parts Manufacturing Facility • Final decision is strategic.

More Related