1 / 24

European Plans for ATF2 G.A. Blair LCPAC, KEK 24 th March 2006

European Plans for ATF2 G.A. Blair LCPAC, KEK 24 th March 2006. Overview CERN + LAPP EUROTeV UK France DESY. ATF2 EU Overview I. ATF2 EU Overview II. CERN Contributions & Plans for ATF/ATF2. contributions to ATF2 ‘studies’ hardware contributions

ikia
Télécharger la présentation

European Plans for ATF2 G.A. Blair LCPAC, KEK 24 th March 2006

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. European Plans for ATF2G.A. BlairLCPAC, KEK24th March 2006 Overview CERN + LAPP EUROTeV UK France DESY

  2. ATF2 EU Overview I

  3. ATF2 EU Overview II

  4. CERNContributions & Plans for ATF/ATF2 • contributions to ATF2 ‘studies’ • hardware contributions • details of precision transformer BPMs • laser-Compton polarized e+ source From: Frank Zimmermann, CERN

  5. CERN ATF-2 “Studies” • development of commissioning strategy; • already wrote section of design report • 2) investigation of optimum beam-based alignment pro-cedures with pertinent specification of BPM ranges • 3) simulation of IP tuning and maximum tuning knob • ranges • 4) survey of relevant collective effects in ATF-2 • and ATF extraction line; particularly wake fields • 5) participation in commissioning activities 1 person month 3 person months 4 person months 1 person month in total: 1 person year approved by CSC on 13.10.2005 3 person months

  6. CERN ATF2 Hardware I • Active stabilization table including stabilizing feet • (STACIS2000 from TMC); • honeycomb structure with • length 2.4 m, width 0.8 m, height 0.8 m; • absence of structural resonance below 230 Hz • stabilizing feet are equipped with geophones, rubber pads for passive damping, and piezo-electric movers for active damping of load vibrations induced from the ground; • table was used for CLIC stabilization study; • presently on loan at Annecy; • available from mid-2006; • best use at ATF-2 to be identified; e.g.: • Stabilize final quadrupoles and IP monitors • value about 100,000 CHF (8.72 MYen)

  7. CLIC test stand for vibration measurements & magnet stabilization studies S. Redaelli, R. Assmann

  8. CERN/LAPP Contributions • LAPP will contribute the FD support system for all the four final focus magnets of QD0, SD0, QF1 and SF1 with the three dimensional analysis of the vibration there. • CERN provides the CLIC active table. • LAPP is also responsible of installation of the FD system and commissioning.

  9. Nano-BPM Built by SLAC group Nano-BPM Built by KEK group ~2m Oxford Stabilization of Focal Point • ATF2 program needs: Stabilization of Shintake monitor of 10nm with respect to final focus qudrupole. • Require to monitor on timescales of seconds and minutes →Laser interferometric straightness monitor. • StaFF group in Oxford is developing a straightness monitor for ILC. A setup using >20 distance meters will be tested at ATF during 2006-2007, with 20-30 nm expected resolution. D. Urner

  10. Oxford R&D for compact Straightness Monitor • ATF setup needed to test • Test distance meter (under accelerator conditions). • Combination of several measurements. • Test of Stabilization algorithms (using BPM movers). • Compact straightness monitor needed for ILC • Integration into one device harder – but allows system with much smaller vertical dimensions (few cm). • ATF2 ideal test facility. • Goal is to provide at least 10nm resolution (as required by ATF2). • Time frame 2009 anticipated. D. Urner

  11. CERN ATF2 Hardware II • Three precision transformer BPMs. • Projected spatial resolution 100 nm • Time resolution: 15 ns; • Aperture 4 mm (available at the end of 2007) • aperture might be increased within limits Advantages of transformer BPMs - arbitrary bunch spacing - large bandwidth (almost 6 decades) - simple readout electronics - insensitive to spray Development cost about 160,000 CHF (13.95 MYen) plus manpower; co-financed by EU via EUROTeV

  12. CERN BPM Design goals • Aperture: 4mm • Resolution: 100nm (CMMR > 92dB) • Absolute precision: 10μm • Rise time: <15ns • Dynamic range: ±1.5mm (15 bits) • Linearity error: < 1% • 24h stability: 1μm • Vibrations <100nm • Low frequency cutoff: 100kHz • High frequency cutoff: 30MHz • Bake out temperature: 150°C • Operating temperature: ~20°C • Vacuum: 10-9 Torr: Lars Soby

  13. Design Idea: Starting point: 40 mm aperture BPM (CTF-3): Aim:4mm aperture PBPM designed by M. Gasior, CLIC Note 572, DIPAC 2003 Lars Soby

  14. CERN also has great interest to participate further in a polarized e+ source based on Compton scattering Snowmass ILC proposal (T. Omori, J. Urakawa, E. Bulyak, P. Gladkikh, K. Moenig, …) uses Compton ring with 30 laser-beam IPs, stacking in main damping ring; modified scheme for CLIC benefits from smaller # bunches, smaller charge, high repetition rate, only 1 laser-beam IP, stacking in compact pre-damping ring yield in CLIC Compton ring vs. turn (E. Bulyak)

  15. ATF2 Laser-wire I • Build on experience at ATF extraction line • Multiple IPs for emittance measurement • Light transport studies, looking to ILC • Implementation of fast-scanning mechanisms. • Understand operational issues and input into ILC technical design. • Complementary programme at ATF and at DESY to address ILC operational issues.

  16. ATF2 Laser-wire II new dedicated IP Integrated BPM? Integrated wire scanner? Multi-dimension scans Light delivery Petra system

  17. ILC/ ATF2 Diagnostics Laser System Laser oscillator choice: • A conventional mode-locked Nd:YLF (1047 nm/1053nm) • or Nd: YAG (1064 nm) laser • or A mode-locked fiber laser (1047/1053/1064 nm) Laser Amplifier choice: High power diode pumped Nd:YLF or Nd:YAG Choice on 2nd harmonic crystal : LBO/BBO (250 nm – 500 nm) • System being investigated now (fiber laser attractive) • Will be built this year at Oxford • High power output will require further second stage • Could be used for laser-wire and Shintake at ATF2?

  18. BDSIM is a Geant4-based beamlne simulation toolkit Used for PETRA laser-wire (J. Carter) In use at ATF (L. Deacon) Plans for ATF2 L. Deacon (RHUL) O. Dadoun (LAL) (EUROTeV) Important to benchmark for ILC BDSIM simulation of ATF/ATF2 beamline http://flc.pp.rhul.ac.uk/bdsim.html

  19. FONT: Intra-train Feedback 67 ns 2002 2004 54 ns 23 ns 2005 FONT4 digital processor board P. Burrows

  20. France at ATF2 LAL-Orsay, LAPP-Annecy and LLR Polytechnique, together with 8 scientists from KEK, have just sent in a joint application (~€800k) to the newly created ANR (Agence Nationale de la Recherche) for project money to work on ATF-2 in the period 10/2006-9/2010. Result is expected in July 06. • Development and implementation of the beam • correction algorithms • Beam line modeling with an optimised version of the • GEANT4 simulation • Active stabilisation of critical mechanical support • structures for the final Focus • Development of specific beam instrumentation

  21. DESY at ATF2 • Stabilisation study for the FD system and the site (ground motion at the ATF2 floor) • Laserwire; interest in Compton detector and in data taking + analysis (part of EUROTeV) • Fast kicker to produce the ILC like bunch structure at ATF2 in the future. • DESY may also be interested in fabrication of magnets.

  22. Funding Programmes • Funded until Dec. 2007 • Includes ATF/ATF2: • CERN BPM, • Laser-wire • STAFF (stabilisation) • FONT, NanoBPM • BDSIM • Funded until Mar. 2007 • Includes ATF/ATF2: • Laser-wire • FONT, NanoBPM • BDSIM

  23. SUMMARY • A very active and fruitful collaboration involving • European partners at ATF/ATF2 • Plans are advanced for future participation in • Both the hardware and the running of ATF2 • BPM • Compton source • Laser-wire/Shintake • Lasers • Stabilisation • Feedback • Simulation/optimisation The next funding round is starting now …

More Related