Agitator Redesign for Corrosive Environment

Agitator Redesign for Corrosive Environment. Kate Karauda Luigi Abbate Will Fritzinger Peter Torab. Project Overview. Sponsored by Coating Technology I nc . G oal is to redesign the agitator system for greater corrosion resistance and longer life. Tank Layout. Current Cam System.

Télécharger la présentation

Agitator Redesign for Corrosive Environment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agitator Redesign for Corrosive Environment Kate Karauda Luigi Abbate Will Fritzinger Peter Torab

  2. Project Overview • Sponsored by Coating Technology Inc. • Goal is to redesign the agitator system for greater corrosion resistance and longer life

  3. Tank Layout

  4. Current Cam System

  5. Luigi

  6. System Design • Vertical Axis Rotary Motion (VARM) • Carousel with part mounts • Corrosive resistant materials • Utilization of current tanks and framework • Motor and gearbox moved away from vapors • Continuous motion vs. sinusoidal

  7. Design Areas Not Yet Complete • Rotational Motion vs. Ultrasonic • Ultrasonic shows a lot of potential • Capillary Forces • Quick Wear Calculations • Power Selection • Belt Wear Rates • Component Design • Off Shelf Part Considerations

  8. Project Schedule

  9. Project Schedule • Current Action Items: • Pick a design to satisfy customer needs, • Defining test conditions for the prototype design, • Document and investigate previous failure modes, • Invite the customer for Systems Decomposition Review;

  10. Project Risks & Mitigation Plans