Chapter 3: Linear Programming Sensitivity Analysis

Chapter 3: Linear Programming Sensitivity Analysis. Sensitivity Analysis What if there is uncertainly about one or more values in the LP model? Raw material changes, Product demand changes, Stock price

indiya
Télécharger la présentation

Chapter 3: Linear Programming Sensitivity Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 3:Linear ProgrammingSensitivity Analysis

  2. Sensitivity Analysis What if there is uncertainly about one or more values in the LP model? • Raw material changes, • Product demand changes, • Stock price Sensitivity analysis allows a manager to ask certain hypothetical questions about the problem, such as: How much more profit could be earned if 10 more hours of labour were available? Which of the coefficient in model is more critical?

  3. Sensitivity analysis allows us to determine how “sensitive” the optimal solution is to changes in data values. This includes analyzing changes in: • An Objective Function Coefficient (OFC) • A Right Hand Side (RHS) value of a constraint Sensitivity Analysis

  4. Max Ax + BY Keeping x, Y same how the object function behaves if A, B are changed. The optimal solution will remain unchanged as long as An objective function coefficient lies within its range of optimality If the OFC changes beyond that range a new corner point becomes optimal. Limit of Range of optimality

  5. Generally, the limits of a range of optimality are found by changing the slope of the objective function line within the limits of the slopes of the binding constraint lines. Binding constraint Are the constraints that restrict the feasible region

  6. We can use the graph of an LP to see what happens when: • An OFC changes, or • A RHS changes Recall the Flair Furniture problem Graphical Sensitivity Analysis

  7. Sensitivity to Coefficients Graphical solution of Example 1 Example 1: Max 5x1 + 7x2 s.t. x16 2x1 + 3x2< 19 x1 + x2< 8 x1> 0 and x2> 0 x1 + x2< 8 Max 5x1 + 7x2 x1< 6 Optimal solution: x1 = 5, x2 = 3 2x1 + 3x2< 19 Feasible region

  8. Sensitivity to Coefficients Range of optimality for c1 • Compute the range of optimality for c1 in Example 1. • The slope of an objective function line, Max c1x1 + c2x2, is -c1/c2. • The slope of the binding third constraint, x1 + x2 = 8, is -1. • The slope of the binding second constraint, 2x1 + 3x2 = 19, is -2/3. • Find the range of values for c1 (with c2 staying 7) such that the objective-function line slope lies between that of the two binding constraints: -1 < -c1/7 < -2/3 Multiplying by -1, 1 >c1/7 > 2/3 Multiplying by 7, 7 >c1> 14/3 Example 1: Max 5x1 + 7x2 s.t. x1< 6 2x1 + 3x2< 19 x1 + x2< 8 x1> 0 and x2> 0

  9. Sensitivity to Coefficients Range of optimality for c2 • Likewise, compute the range of optimality for c2 in Example 1. • The slope of the binding third constraint is -1. • The slope of the binding second constraint is -2/3. • Find the range of values for c2 (with c1 staying 5) such that the objective-function line slope lies between that of the two binding constraints: -1 < -5/c2< -2/3 Multiplying by -1, 1 > 5/c2> 2/3 Inverting, 1 <c2/5 < 3/2 , Multiplying by 5 5 <c2< 15/2 Example 1: Max 5x1 + 7x2 s.t. x1< 6 2x1 + 3x2< 19 x1 + x2< 8 x1> 0 and x2> 0 Example 1: Max 5x1 + 7x2 s.t. x1< 6 2x1 + 3x2< 19 x1 + x2< 8 x1> 0 and x2> 0

  10. Sensitivity to Coefficients Graphical solution of Example 1 Max 7S + 9D 7/10S+1D<=630 (Cutting & dyeing) 1/2S+5/6D <=600 Sewing 1S+2/3D<=708 Finishing 1/10S+1/4D<=135 Inspection & Packaging Optimal solution: S=540,D=252 1. objective function 2. Cutting Line 3.Finishing Line This point will be an optimal solution as long as: slope of line A <=slope of the objective function <= slope of line A i.e. the slope of the objective function should be in between these two lines

  11. 7/10S+D=630 (C&D) D=-7/10S+630 S+2/3D=708 (Finishing) D=-3/2S+1062 -3/2<=slope of objective function <=-7/10 -3/2<=-Cs/Cd<=-7/10 if we put profit contribution of delux bag same i.e 9 -3/2<=-Cs/9<=-7/10 Cs>=3*9/2 Cs>=27/2 Cs>=13.5 Cs>=63/10 Cs>=6.3 6.3 <=Cs<=13.5 (limits for Cs with same optimal solution)

  12. Similarly the keeping profit contribution of S bag constant. Cs=10 6.67<=Cd<=14.29 (range of optimality) If both the Cs, Cd are changed simultaneously (i.e S bags to 13, D bags to 8) Calculate the slope again: -cs/cd =-13/8=-1.625 -3/2<=-Cs/Cs<=-7/10 now -Cs/Cd=-1.625 which is less than -3/2 which is not acceptable according to above equation hence this means if we change the both cofficient than 540 and 252 would not be the optimal solution.

  13. suppose if additional 10 hrs is added to cutting and dyeing constraint 7/10S+1d<=640 ??? Feasible region extended, find extreme point using intersection of two lines S=527.5 ,D=270.75 Max 10S+9D Profit= 7711.75 which is 7711.75-7668.00 =43.75 Increase in profit/hr = Effect of change of the righ hand side of the constraint.

  14. It is the improvement in the optimal solution per unit increase in the RHS of contraint .if dual price is negative this means value of objective function will not improved rather it would get worse ,if value at rhs of the constrain is increased by 1 unit . for minimization problem it means cost will increase by 10. Dual Price

  15. For all the objective functions that are changed the sum of percentages of allowable increase and allowable decrease if does not exceed by 100% then optimal solution will not change. However this does not means that if sum of the percentage is exceed by 100% then optimal solution will change , in that case the problem must be resolved . This rule is equally applicable on the constraints RHS. 100 % Rule for objective function cofficients & constraint

  16. S is changed from 10$ to 11.50$; D is reduced from $9 to $8.25 Range of optimality from the sensitivity analysis : allowable upper limit for S= 13.49; Value of S =$10 Allowable increase in S= 13.49-10 =3.49 for the present case D is reduced from $9 to $8.25 the increase in percentage is 1.5*100/3.49=42.86% of allowable increase Example

  17. For D allowable lower limit is 6.66 Value of D=9 allowable Decrease =9-6.66=2.33 for present case =0.75/2.33*100= 32.14 of allowable decrease. sum of allowable increase and decrease is 42.86% + 32.14% <100% hence optimal solution is still valid S=540 and D-252. Example

  18. Max 7T + 5C (profit) Subject to the constraints: 3T + 4C < 2400 (carpentry hrs) 2T + 1C < 1000 (painting hrs) C < 450 (max # chairs) T > 100 (min # tables) T, C > 0 (nonnegativity) Flair Furniture Problem

  19. What if the profit contribution for tables changed from $7 to $8 per table? 8 Max 7 T + 5 C (profit) Clearly profit goes up, but would we want to make more tables and less chairs? (i.e. Does the optimal solution change?) Find the range of optimality with graph. Objective FunctionCoefficient (OFC) Changes X

  20. C 500 400 300 200 100 0 Original Objective Function 7T + 5 C = $4040 Optimal Corner (T=320, C=360) Still optimal Revised Objective Function 8T + 5 C = $4360 Feasible Region 0 100 200 300 400 500 T

  21. C 1000 600 450 0 What if the OFC became higher? Or lower? 11T + 5C = $5500 Optimal Solution (T=500, C=0) 3T + 5C = $2850 Optimal Solution (T=200, C=450) Both have new optimal corner points Feasible Region 0 100 500 800 T

  22. There is a range for each OFC where the current optimal corner point remains optimal. • If the OFC changes beyond that range a new corner point becomes optimal. • Excel’s Solver will calculate the OFC range.

  23. What if painting hours available changed from 1000 to 1300? 1300 2T + 1C < 1000 (painting hrs) This increase in resources could allow us to increase production and profit. Right Hand Side (RHS) Changes X

  24. The constraint line shifts, which could change the feasible region • Slope of constraint line does not change • Corner point locations can change • The optimal solution can change Characteristics of RHS Changes

  25. Old optimal corner point (T=320,C=360) Profit=$4040 C 500 400 300 200 100 0 Feasible region becomes larger New optimal corner point (T=560,C=180) Profit=$4820 Original Feasible Region 2T + 1 C = 1000 2T + 1 C = 1300 0 100 200 300 400 500 600 T

  26. New profit = $4,820 Old profit = $4,040 Profit increase = $780 from 300 additional painting hours $2.60 in profit per hour of painting • Each additional hour will increase profit by $2.60 • Each hour lost will decrease profit by $2.60 Effect on Objective Function Value

  27. Decision: How many of each of 4 products to make? Objective: Maximize profit Decision Variables: V = number of VCR’s S = number of stereos T = number of TV’s D = number of DVD players Anderson Electronics Example

  28. Max 29V + 32S + 72T + 54D (in $ of profit) Subject to the constraints: 3V + 4S + 4T + 3D < 4700 (elec. components) 2V + 2S + 4T + 3D < 4500 (nonelec. components) V + S + 3T + 2D < 2500 (assembly hours) V, S, T, D > 0 (nonnegativity) Go to file 4-2.xls

  29. RHS Change Questions • What if the supply of nonelectrical components changes? • What happens if the supply of electrical components • increased by 400 (to 5100)? • increased by 4000 (to 8700)?

  30. What if we could buy an additional 400 elec. components for $1 more than usual? Would we want to buy them? • What if would could get an additional 250 hours of assembly time by paying $5 per hour more than usual? Would this be profitable?

  31. We are not currently making any VCR’s (V=0) because they are not profitable enough. How much would profit need to increase before we would want to begin making VCR’s? Decision Variables That Equal 0

  32. (marginal contribution to the obj. func. value) - (marginal value of resources used) = Reduced Cost marginal profit of a VCR = $29 - marginal value of resources = ? Reduced Cost of a VCR = - $1.0 Reduced Costof a Decision Variable

  33. Reduced Cost is: • The minimum amount by which the OFC of a variable should change to cause that variable to become non-zero. • The amount by which the objective function value would change if the variable were forced to change from 0 to 1.

  34. For what range of profit contributions for DVD players will the current solution remain optimal? What happens to profit if this value drops to $50 per DVD player? OFC Change Questions

  35. May be present when there are 0’s in the Allowable Increase or Allowable Decrease values for OFC values. Alternate Optimal Solutions

  36. All changes discussed up to this point have involved only 1 change at a time. What if several OFC’s change? Or What if several RHS’s change? Note: they cannot be mixed Simultaneous Changes

  37. ∑ (change / allowable change) < 1 RHS Example • Electrical components decrease 500 500 / 950 = 0.5263 • Assembly hours increase 200 200 / 466.67 = 0.4285 0.9548 The sensitivity report can still be used The 100% Rule

  38. Suppose they are considering selling a new product, Home Theater Systems (HTS) Need to determine whether making HTS’s would be sufficiently profitable Producing HTS’s would take limited resources away from other products Pricing New Variables

  39. To produce one HTS requires: 5 electrical components 4 nonelectrical components 4 hours of assembly time • Can shadow prices be used to calculate reduction in profit from other products? (check 100% rule) 5/950 + 4/560 + 4/1325 = 0.015 < 1

  40. elec cpnts 5 x $ 2 = $10 nonelec cpnts 4 x $ 0 = $ 0 assembly hrs 4 x $24 = $96 $106 Making 1 HTS will reduce profit (from other products) by $106 Required Profit Contribution per HTS Shadow Prices

  41. Need (HTS profit contribution) > $106 • Cost to produce each HTS: • elec cpnts 5 x $ 7 = $35 • nonelec cpnts 4 x $ 5 = $20 • assembly hrs 4 x $10 = $40 • $95 • (HTS profit contribution) = (selling price) - $95 • So selling price must be at least $201

  42. Marketing estimates that selling price should not exceed $175 • Producing one HTS will cause profit to fall by $26 ($201 - $175) Go to file 4-3.xls Is HTS Sufficiently Profitable?

  43. Burn-Off makes a “miracle” diet drink Decision: How much of each of 4 ingredients to use? Objective: Minimize cost of ingredients Sensitivity Analysis fora Minimization Problem

  44. Data

  45. Min 0.40A + 0.20B + 0.60C + 0.30D ($ of cost) Subject to the constraints A + B + C + D > 36 (min daily ounces) 3A + 4B + 8C + 10D > 280 (chem x min) 5A + 3B + 6C + 6D > 200 (chem y min) 10A + 25B + 20C + 40D < 280 (chem z max) A, B, C, > 0 Go to file 4-5.xls