Module 16: Environmental Issues And Permitting

Module 16: Environmental Issues And Permitting. Objectives. Learn about applying environmental regulations and typical compliance procedures to your railroad projects Identify projects that require permits and when to involve resource agencies in project development Recognize agency

indiya
Télécharger la présentation

Module 16: Environmental Issues And Permitting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Module 16: Environmental Issues And Permitting

  2. Objectives • Learn about applying environmental regulations and typical compliance procedures to your railroad projects • Identify projects that require permits and when to involve resource agencies in project development • Recognize agency requirements pertinent to railway projects

  3. Introduction Most railway improvement projects are governed by an environmental regulation or law.

  4. Common Issues • National Environmental Policy Act (NEPA) • Clean Water Act • Water Quality • Wetlands • Endangered Species Act • Historic Preservation Act • Cultural/Historical Resources • Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) • Phase I Environmental Assessment • Brownfields • Resource Conservation and Recovery Act (RCRA) • Clean Air Act • Air Quality • Asbestos • Differing state and international regulations

  5. NEPA and Railroads • Signed into law in 1970, establishing a National Policy for Protection of the Environment. • Required whenever federal funds, land, or major federal decision is involved. • Common agencies include: • Federal Railroad Administration • Surface Transportation Board • Federal Transit Administration

  6. Clean Water Act • The U.S. Army Corps of Engineers (USACE) and the Rivers and Harbors Act of 1899. • Passage of the Clean Water Act in 1972 gave the USACE authority over dredging and filling in “waters of the U.S.” including wetlands. • The USACE issues three types of permits: • Nationwide • General • Individual • Why is this important to Railroads?

  7. What is Jurisdictional? In 2001 the U.S. Supreme Court ruled that the USACE does not have jurisdiction over isolated wetlands (SWANCC v. USACE). In 2006 the Court further defined jurisdiction over adjacent waters (Rapanos/Carabell v. United States) What does this mean for Railroads?

  8. US ACE Wetland Definition(The 3 Criteria) 1) Hydrophytic Vegetation 2) Hydric Soil 3) Wetland Hydrology

  9. Wetland Permitting Process • Contact Federal, State, and Local Agencies early. • Conduct a Preliminary Jurisdictional Determination.. • Apply for Permits. Allow up to 120 days to process. • Expect questions from Agencies during public involvement process.

  10. Clean Water ActBest Management Practices • BMPs – policies, practices, or procedures implemented to prevent surface water degradation from an activity. • Storm Water Pollution Prevention Plans (SWPPP) • Spill Prevention Control and Countermeasure Plans (SPCC)

  11. Endangered Species Act What is an endangered species? • “Endangered” is any animal or plant that is endangered of extinction. • “Threatened” is any animal or plant that is likely to become endangered in the near future. • “Critical Habitat” area which maintains the feature necessary for protection. Federally Endangered Humpback Sucker (Xyrauchen texanus)  Federally Threatened Lakeside Daisy (Hymenoxys herbacea (=acaulis var. glabra))

  12. Endangered Species Act Application to My Project If the project requires permits, licenses, funds, or other authorizations from federal agencies, consultation must occur to determine if the project: • Affects habitat or critical habitat of a listed species, and/or • Involves a “taking” of a listed species. • Examples

  13. Section 106:Historic Preservation Act What are they and how are they defined? • National Historic Preservation Act of 1966, as amended (16U.S.C470f) • Native American Graves Protection and Repatriation Act (P.L. 101-601) • Archaeological Resource Protection Act • Archaeological, prehistoric, or historic sites, structures, and/or artifacts that provide information on the ritual, spiritual, developmental, and/or organizational structure of a past civilization or group of inhabitants.

  14. Cultural Resource Examples • Historic Buildings/Districts • Burial Sites • Campsites • Spiritual Sites • Churches/Cemeteries • Trails • Tunnels • Towers • Bridge • Miscellaneous Structures

  15. CERCLA/Phase I ESA What is it? A Phase I Environmental Site Assessment is the essential first step in determining whether contamination (for example hazardous wastes) exists on a property. When should it be conducted? Completed before proceeding with additional site investigations or when property ownership is transferred.

  16. CERCLA/Phase I ESA Buildings int. & ext. Facility grounds Rail spurs or sidings Above or below ground pump stations Rail or truck loading/unloading docks or areas The report includes record reviews, interviews and physical property inspections to identify areas of potential hazardous substance contamination. The following details what may be included in the visual and physical inspection: • Chemical storage cabinets or closets • Underground/above ground storage tanks • Transformers • Stormwater retention ponds • Air vents and ducts • Stained areas (pavement, soil, etc.) • Pools of liquid • Areas of fill material

  17. RCRA/Hazardous Waste • What is a Hazardous Waste? • Generator is responsible for wastes from point of generation to the point of disposal • Many hazardous wastes are harmful at very small concentrations • Never mix hazardous waste with other wastes • Examples of generated hazardous waste

  18. CERCLA/Brownfield Sites • Old Contaminated Industrial Sites • EPA defined as: “abandoned, idled or underused industrial and commercial facilities were expansion or redevelopment is contaminated” Before After

  19. Clean Air Act The Clean Air Act of 1970 was established “to protect and enhance the quality of the Nation’s air resources so as to promote public health and welfare and the productive capacity of its population.” Primary • Standards are those protective of human health Secondary • Standards are those protective of theenvironment

  20. Clean Air Act Non-attainment areas are areas of the Country where air pollution levels persistently exceed the national ambient air quality standards. Non-attainment pollutants include: • Ozone • Carbon Monoxide • Nitrogen Dioxide • Sulfur Dioxide • Particulate Matter • Lead

  21. Railroad Noise Railroad Noise Basics: Noise in our environment can be described by three characteristics -- loudness, pitch, and time variation. Sound is measured the way the human ear interprets sound. To accomplish this a descriptor called "A-weighted sound level.

  22. Railroad Noise Noise Annoyance FRA Noise Criteria

  23. Railroad Noise Major Sources of Railroad Noise Train Horns Wheels & Couplers Jointed Rail Power Units Noise Mitigation Options Quiet Zones Wayside Horns Low Long Berms/Walls CWR Building Modifications Relocating Receptor

  24. Railroad Vibration Vibration (VdB) can cause damage to structures and annoyance to receptors. Vibration Mitigation Options • Maintenance procedures #1, • Location and design of special trackwork, • Vehicle modifications, • Changes in the track support system, • Building modifications, • Adjustments to the vibration transmission path, • Operational changes.

  25. Clean Air Act/Asbestos • Asbestos is a natural mineral fiber that is known for its strength and fire-resistant properties. • It can be found in: • Building materials, • Tanks and piping insulation, • Brake shoes • May run into asbestos problem during a demolition and renovation project. Note, a qualified asbestos hygienist must survey the area.

  26. Railroad Environmental Benefits • Reduces Air Pollution and Energy Efficiency • Reduced Noise Pollution • Wetlands Protection and Reduced Water Pollution • Reduced Light Pollution • Brownfields Reclamation and Recycling • Historic and Ecological Preservation Benefits • Major economic benefits • Reduced accident rate

  27. Canadian Regulations Important Canadian environmental laws include: • Canadian Environmental Protection Act • Canadian Environmental Assessment Act • Fisheries Act • Species at Risk Act • Navigable Water Protection Act • Migratory Birds Convention Act • Federal Policy on Wetlands Conservation

  28. Mexican Regulations • The United Mexican States mandates preservation and restoration of the environment through the General Law of Ecological Equilibrium and Environmental Protection. • The Secretariat of Social Development (SEDESOL) has overall jurisdiction over environmental laws.

  29. Case Examples • Emergency Situations • Normal Operations

  30. Emergencies Scenario 1- Potential Bridge or Culvert Washout During Flooding Initial Setting: The project site is located at the crossing of a large stream-fed emergent wetland by the railroad tracks. Heavy rains have resulted in flood conditions in the stream and wetland. The railroad track crossing forms a partial dam across the wetland, constricting flow through the bridge crossing, and several culvert crossings off the main channel of the stream. Flood flows are causing erosion at the bridge abutment, and flood levels are approaching the top of the tracks threatening erosion under the tracks and disruption of train service. Partial blockage of the culverts results in elevation of flood waters. Brand X railroad response is required between 6PM and 10PM after normal business hours.

  31. Scenario 1/Issues Issues: There is an immediate Risk to life and property, which qualifies this project as an emergency, the primary emergency issues are: • The bridge abutment must be stabilized • Flows over the tracks should be alleviated • Establishment of flows through the culverts would prevent excessive retention of flood flows and alleviate flows over the tracks • large wetland crossing, flood, erosion and sedimentation

  32. Scenario 1/Actions Approach and Actions. There are several important factors that must be immediately evaluated: • Immediate response by railroad crews will prevent further damage to the bridge and tracks, and allow service to continue. • The required work must be performed in a wetland and waters subject to specific permit requirements. • Railroad staff does not know if any species of concern are present in the wetland and work areas. • Railroad response actions could directly affect the wetland in the work areas as well as result in indirect effects in the wetland and stream.

  33. Normal Operations Scenario 2- Track Replacement with Grading Work Initial Setting: The project is located in an area running parallel to a stream. The proposed work involves upgrading a section of track that will involve minor grading that may result in discharges to the adjacent stream. The stream is a major trout fishery and the entire project area is surrounded by lands managed by the BLM.

  34. Scenario 2/Issues Issues. This project is part of regular system maintenance and upgrades. It is not an emergency project. The primary issues that must be addressed are: • The work will be performed entirely within the Railroad ROW • The work does not involve discretionary approvals from County or local agencies. • The work will be in close proximity to the stream, which is a habitat of concern. • Discharge of material to the stream may occur.

  35. Scenario 2/Actions Approach and Actions. There are several important factors that must be evaluated: • Railroad X has sufficient time to evaluate the project for potential adverse environmental effects, to develop design plans to implement the work without adverse effects, and to obtain appropriate environmental and other approvals before implementing any work. • Work in the stream can be avoided, including avoidance of discharges to the stream. • It will be important to implement construction BMPs to avoid discharges to the stream. • The level of concern for the stream warrants an onsite monitor during construction in this area. • Coordination with the State DFG, Corps, and BLM is warranted.

  36. Questions ?