Test of FIC materials. V.Grishin , IHEP-CERN BE-BI-BL #3, October 1 st 2013. List of materials. SCT (1). CERN measurements: From visual inspection of the all 327 insulators:

iokina
Télécharger la présentation

Test of FIC materials

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Test of FIC materials V.Grishin , IHEP-CERN BE-BI-BL #3, October 1st 2013

  2. List of materials

  3. SCT (1) CERN measurements: From visual inspection of the all 327 insulators: – around 15 insulators has the length of ceramics ~ 5.5 cm instead of 6.5 cm , but leakage current of this type of insulators is less that 1 pA - Measurements of outside geometry SCT answer: Au point de vuegéométrie: La cote entre ferrureest de 7.5 mm, mais la cote entre les deux bandeaux métallisésest en moyenne à 6 mm et peutlégèrementvariersuivant la largeur des bandeaux, néanmoinscettelongueurrestesuffisante pour isolervotre tension de 3000V,

  4. SCT (2) SCT answer: Au point du vue test électrique, nous avons fait un contrôle à 100% pour voirl'isolation de cespièces sous une tension de 3000V et nous avonsvérifiésur 100% des pièces sous 2000V que le courant de fuiteest <10^-11A. CERN measurements at 2 kV: From all 327 insulators only 2 are bad: LC is 100 pA.

  5. Feed through • Visual inspections of all, 550 pcs - no visual defects • Measurements at 2 kV of ~100 pcs - Leakage current less than 1 pA

  6. Electrode plates We chose the Laser Cutting plates. Expect to have it at CERN in the middle of October