Generation Choices June 20, 2013 Mac McLennan President and CEO Minnkota Power Cooperative
HeadquartersGrand Forks, N.D. Young StationCenter, N.D. • Minnkota headquarters in Grand Forks • 352 employees • 177 Grand Forks • 175 Young Station • Primary source of generation is the Milton R. Young Station near Center, N.D. • Minnkota supplies electricity to 11 distribution cooperatives, three in eastern N.D., and eight in northwestern Minn.
Generation Distribution Transmission
Types of Generation • Baseload power is available for 24-7 demand • High-capacity generating plants • Plants cost less to operate when at full efficiency • Peaking power is available when demand is highest • Higher cost to operate, but quick start-up to reactto demand changes • Intermittent power is available when supply allows • Cannot be relied upon to react to level of demand
Our Generation Facilities • 1,086 nameplate megawatt capacity • Coal 605 MW 73% • Young Station – 477 MW • Coyote Station – 128 MW • Wind 359 MW 19% • Hydro 122 MW 8% • (A megawatt is the capacity to serve about 800 homes)
Class Activity on Energy Choices • Discuss in small groups what energy resource(s) you would use to meet significant future demands • Choices: lignite, nuclear, hydropower, natural gas, wind, fuel cells and/or solar
Class Activity on Energy Choices Nuclear Hydropower Natural gas Wind Solar Lignite
Nuclear • Advantages • No CO2 emissions • Relatively low-cost fuel • Disadvantages • Large capital cost • Radioactive waste • Almost impossible to solve waste disposal problems through Congress • Last U.S. nuclear power plant licensed in the 1970s
Hydro • Advantages • No fuel cost • Low-cost energy to consumer • No air emissions • Disadvantages • Affects fish and wildlife habitat • Alters the natural flow of rivers • Virtually no resources left to develop(some dams being removed) • Montana’s Yellowtail Dam finished in 1967
Natural Gas • Advantages • Moderate capital costs • Less emissions than lignite-produced electricity • Currently, natural gas is low-priced • Disadvantages • Potential resource adequacy • Costs have been historically volatile • Natural gas sold to electric utilities increased from $2.62 per dekatherm in 1999 to $12.80 per dekatherm in 2008 – currently at about $4.50 per dekatherm
Wind • Advantages • Renewable • No air emissions • Disadvantages • Has intermittent production • Turbines take a lotof space • Equipment aesthetically unpleasing to some and kills birds • Because of intermittent nature, requires back-up generation sources
Langdon Minot Petersburg Wilton Ashtabula Valley City Edgeley Questionon Diversity Hyde Pipestone Chamberlain Crosswind
Wind Comparison (Each site normalized to 1 MW)
Solar • Advantages • Renewable • No air emissions • Disadvantages • Expensive • Intermittent production
Lignite • Advantages • Abundant fuel source • Relatively inexpensive fuel source • Reliable • Increasingly clean • Disadvantages • Low Btu content • High moisture content • Cannot economically rail • New federal emissions regulations cause uncertainty
Classroom Activity • What percentage of the electricity in the United States is generated by:(take one minute to do) • Coal _______ • Nuclear _______ • Gas _______ • Hydro _______ • Petroleum _______ • Renewables _______
Classroom Activity • Coal42% • Gas 25% • Nuclear 19% • Hydro 08% • Other 06% Based on 2011 information from Department of Energy
North Dakota • 7thlowest retail electricity prices in the nation • Average retail price 7.7 cents • Power rates are very lowbecause of low-cost coal(82 percent) generation • Coal costs are nearly 40 percent below the national average because mine-mouth plants use local low cost lignite and do not pay for “transportation” costs Wind Coal Coal 82% Source: 2011 Energy Information Administration 6/21/12
Minnesota Natural Gas Other • 19thlowest retail electricityprices in the nation • Average retail price 9.23 cents • Power rates are relatively lowbecause of high proportion oflow-cost coal generation & modest nuclear exposure • 52 percent of in-state utility generation from coal-fired stations • About one-sixth of state’s electricity imported from North Dakota Coal Nuclear 24.8% Nuclear Coal 62.1% Source: 2011 Energy Information Administration 6/21/12
South Dakota • 14thlowest retail electricity prices in the nation • Average retail price 8.4 cents • Relatively high distribution costs are largely offset by low cost coal generation and hydroelectric generation Other Hydro Coal Source: 2011 Energy Information Administration 6/21/12
Montana • 12thcheapest retail electricity prices in the nation • Average retail price 8.3 cents • Power rates are low because of high proportion of low cost coal (62 percent) & hydro (32 percent) Hydro Coal Source: 2011 Energy Information Administration 6/21/12
Iowa • 7thcheapest retail electricity prices in the nation • Average retail price 7.7 cents • Power rates are low because of high proportion of low cost coal (72 percent) & nuclear (7 percent) Other Coal Source: 2011 Energy Information Administration 6/21/12
This Region Depends On Coal-Based Electricity • Coal must remain a part of America’s future • New technology is required • Time is important • Sharing of risk • Federal • Industry
Importance of Coal-Based Electricity • Affordable, reliable electricity is important to families and businesses • Important for low-income families • Important competitive factor for region’sfarms & businesses • Important economic development incentive
Importance of Coal-Based Electricity • Coal-based industry provides affordable, reliable electricity • North Dakota is one of 7 states meeting U.S. air quality standards • 30 million tons of lignite consumed per year
Challenges of Resource Planning • Regulatory Uncertainty • Each generation source has advantages and disadvantages • Large investments • Generation sources expected to last 50 years or longer
Other considerations • Public wants affordable, reliable electricity • Regulators want economical and environmentally compatible sources • Environmental activists have demonstrated a proclivity to sue • No comprehensive federal energy policy
So as a fellow CEO….I hope you would agree that an “all of the above” energy policy is best!
Thank you for your dedicationin educating studentson the lignite industry!