1 / 12

Energy Efficiency Improvement & Greenhouse Gas Reduction Project

Energy Efficiency Improvement & Greenhouse Gas Reduction Project. Previous Efforts in the Electricity Sector to Improve Energy Efficiency. Load Management Program with the support of the World Bank. Load Management strategy mainly for cement industry, and irrigation pumping.

irina
Télécharger la présentation

Energy Efficiency Improvement & Greenhouse Gas Reduction Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Energy Efficiency Improvement & Greenhouse Gas Reduction Project

  2. Previous Efforts in the Electricity Sector to Improve Energy Efficiency • Load Management Program with • the support of the World Bank. • Load Management strategy mainly • for cement industry, and irrigation • pumping. • New Contracts for EHV & HV • consumers based on 0.9 power • factor instead of 0.8. • Maximum use of natural gas. • Increase of generation efficiency • through rehabilitation, conversion to combined cycle, and selection of large • sizes for new units. • Reduction of transmission and • distribution losses from 19% in 1981 • to 13% in 1998, by rehabilitation of networks and installation of shunt capacitors. General Aspects On Supply Side On Demand Side Pilot Programs • 13 energy audits for different industries have been completed by EEA, • Alexandria Electricity Company and OEP (sponsored by USAID). • Installation of Time of Use (TOU) meters on some sites of big consumers. • Pilot program for distribution of 1000 CFLs in Alexandria with the support • of the European Commission.

  3. Energy Efficiency Improvement & Greenhouse Gas Reduction (GEF/UNDP) Project Duration of Execution : Four years and six months Total Budget :5.895 M US$ Financing of the Project :GEF 4.11 M US$ UNDP 0.8 M US$ (Cost Sharing)Gov.0.985 M US$

  4. Energy Efficiency Improvement and Greenhouse Gas Reduction Reduce GHG Emmisions From Electric Power Generation Overall Objective The overall objective of this project is to assist Egypt to reduce the long term growth of GHG emission from electric power generation and from consumption of on-renewable fuel resources.

  5. 1 Supporting efficiency improvement and loss reduction in electricity generation, transmission & distribution. 2 Enhancing EEA capabilities in integrated resource planning (IRP). 3 Stimulating customers demand and supporting market delivery for energy efficiency services and equipment. 4 Promoting private sector involvement for investing in energy efficiency projects. Enhancing regional co-operation and exchange of experience in this field. 5 Development and implementation of energy conservation measures in residential, commercial and industrial sectors. 6 Activities to fulfill this Objective:

  6. Organization Chart High Level Coordinating Committee Project Technical Director Advisory Council Component 2 Component 1 Component 3 Loss Reduction Team Load Shifting Team Audit & Tech Services Team Business Cogeneration Team Finance & Team Info Codes & & Standards Promotion Teams Team

  7. Implementing Agencies - Egyptian Electricity Authority (EEA). - Organization For Energy Planning (OEP). Supporting Agencies - UNDP - Cairo - UN Department of Economic &Social Affairs (DESA). - Building Research Institute (Egypt). - Egyptian Organization for Standards. Project Implementation Partners:

  8. Component 1 Activities: LOSS REDUCTION, LOAD SHIFTING AND LOAD MANAGEMENT IN THE UPS Component 1 1) Reduce Transmission Losses. 2) Set Priorities for Dynamic Response. 3) Network Analysis and Control Strategies. 4) Load Shifting Through Applying Time of Use (TOU) Tariff.

  9. Component 2 Activities: ENERGY EFFICIENCY MARKET SUPPORT Component 2 1) Energy Efficiency Industry Support and Promotion. 2) Energy Standards and Labeling For New Equipment. 3) Energy Efficiency Codes for the Design and Construction of New Buildings. 4) Establishment of Energy Efficiency Center.

  10. Component 3 Activities: Cogeneration • Establish and train a small power group within EEA; • Establish safety and interconnection requirements for • parallel grid connections with small producers; • Create infrastructure for EEA to purchase electricity • from small producers; • Establish and develop materials for a customer-training • program.and • Develop industrial cogeneration project. Component 3

  11. After the adoption of the developed measures, the full impact of • the project activities is expected to be achieved by the year 2010. • Energy savings and CO2 emissions reduction by that year from the project components are expected to be as follows : CO Reduction 2 Component 1 Component 2 Component 3 Long Term Achivement Savings % of Total Energy Consumption 0.4 % 0.48 MTons 7.4 % 8.25 MTons 2.7 % 3.00 MTons

  12. Thanks

More Related