Sapa working with Vision Solutions

Sapa working with Vision Solutions. The Sapa Group. Develops, manufactures and markets value-added profiles, profile-based building systems and heat exchanger strip in the light-weight material aluminium. Our Group's business concept is built on close cooperation with our customers

ivan
Télécharger la présentation

Sapa working with Vision Solutions

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sapa working with Vision Solutions

  2. The Sapa Group • Develops, manufactures and markets value-added profiles, profile-based building systems and heat exchanger strip in the light-weight material aluminium. • Our Group's business concept is built on close cooperation with our customers • Presence in Europe, North America, Central America and Asia • A turnover of 5 billion USD and 15,000 employees. 

  3. Sapa in the UK • Sapa Profiles Ltd – extrudes Aluminium Profiles with sites in Tibshelf, Derbyshire and Cheltenham, Gloucestershire • Sapa Building Systems Ltd – design and manufactures Door and Window Systems with 3 sites in Gloucestershire • Relationship between the companies – • Sapa Profiles is Sapa Building Systems’ biggest supplier • Sapa Building Systems is Sapa Profiles’ largest customer

  4. UK Data Centre • Based in Tewkesbury, Gloucestershire • MPLS WAN • Provides and supports the IT infrastructure for the 5 Sapa UK sites 24/7 • 253 Users in Movex • 329 Users in the Network • Supporting Movex, Citrix, Exchange, Streamserve, Office etc • Staffed by myself and 3

  5. Movex • First implementation in 2002 • 3 Phases • Sapa Building Systems • Sapa Profiles Cheltenham site • Sapa Profiles Tibshelf site • Setup as 1 company with two divisions • COM, MPM, FAM and SMS implemented • Profiles: • Lots of Mods • Make to order only • Building Systems • 3 Mods • Make to order, Stocked • Both divisions using Configurator and Family Items • Webshop – an early version of eSales

  6. Issues • Housekeeping – not a concept users related to. • Sapa Profiles allowed to deliver 10% above or below Order Quantity therefore order lines never closed • Reports taking too long to run – how do you select only outstanding orders? • Screens cluttered • Response times degraded • Additional Files for the Mods – but very little documentation and no housekeeping routines • No Archiving process from Lawson (then Intentia) • The only solution appeared to be a new machine

  7. How did we find Vision Solutions • Early 2005 we attended an MUA meeting at Bostik, where Vision Solution presented Data Manager • Simple Concept of Selecting, Copy, View then Archiving • Selecting – different requirements for each division, and some cases different by process • Copy “but don’t purge” – taking away the fear from users that the transactions “have gone forever”. Viewable before any actual archiving • View – users can validate the Archive before it actually happens • Archiving – viewable via Explorer – just different company One problem not tried and tested in a Make to Order environment – so the challenge was set. • At that time Director was an added bonus

  8. The Journey • Early September 2005 – first proof of concept • Did not work, could not differentiate between MO, DO,CO and PO using Ref Order Category • December 2005 – they were NOT giving up • It worked – new functionality with Advanced Filters • Order placed and installed in 2006 • Trained in Data Manager and Director • Simple and easy to use • Just installed version 7.1

  9. Results from Director and Data Manager • 30% reduction in Storage – 1st time Director was used • File maintenance previously taking hours now takes minutes. • Planned maintenance actually happens. • Housekeeping improved – weekly measures in place • Greater focus • Greater focus understanding of the data integrity by the users.

  10. Future Plans • Sapa Building Systems plan to step up to M3 first. • Sapa Profiles currently have too many mods in place to make this cost effective. Therefore need to divide the company into two separate databases – using Data Manager it will be easy – controlled and validated by the Key Users.