Assemblies Estimating

Design. Stage 1 Preconstruction. Stage 2: Procurement. Conceptual Planning. Stage3: Construction. Stage 4: Project Close-out. Assemblies Estimating. Assemblies (Systems) Estimating. Done in the design stage and can provide accuracy in the ± 10% range

Télécharger la présentation

Assemblies Estimating

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Assemblies Estimating

  2. Assemblies (Systems) Estimating • Done in the design stage and can provide accuracy in the ± 10% range • Needs at least design detail approaching the 25-30% complete range. • Not adjusted for time, location, design fees and O&P • Sales tax on material to be added. ASSUME MATERIAL COST 50% OF TOTAL COST • large companies develop their own cost guides • R.S. Means publishes “Assemblies Cost Data” which is updated annually.

  3. Using Means Assemblies Cost Data • Commercial buildings are broken-down into smaller systems “divisions” and components according to the “Uniformat”. We used the same system in SF estimate • The idea is that we are trying to create a table in the same format as the ones we used in SF detailed estimate. We are using the same systems/components column. Then, we fill the specs and the cost columns with specs and costs of our project.

  4. Examine the example page 225 of Means page L-97 with tables page 229 of Means page L-96, subdivision 1.1. Try to relate the assembly number and description to the cost. • After the costs of the 12 systems are obtained, complete a table similar to the one shown in Figure 5-16 . • Notice that tax, general conditions and O&P are computed in that table. Also, the cost is adjusted for location and time. Finally design fees are added. • The term “General Conditions Work” means all work and associated cost to complete the Construction Work that is not included in CM/Contractor’s Base Fee or in Bid Packages; including, but not limited to, items required by the exhibits.“ • Contingencies: errors and oversights, imperfections in estimating methods, accidental events during construction, economics and environmental conditions, etc • The final step is to compute the cost/SF by dividing the cost by floor area.